6kVA 5 in 1 Diesel 300A Post Welding Machine Generator Power Generation

Min.Order: 1
Product origin: Fuzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 1080 ~ 2999

Description
 6kva 5 in 1 Diesel 300a post Welding machine Generator power generation
         Different from traditional welding generator machine, GUANGLING inverter welding generator adopts IGBT technology and smart module inside which will ensure big power output and welding & generating work at same time. By the way, welding function can also be used separately. When there is city power, you can directly use city power, without starting the generator for welding.
 
MODELS5000D(E)WS6500D(E)WS7500D(E)WS8500D(E)WS10000D(E)W
Frequency50/60
Rated voltage(v)110,120,220,230,240
Rate output KVA 4.2/4.5   1.8/2.04.6/5.0   1.8/2.02.0/2.0   5.0/5.52.8/3.0   6.0/6.53.5/4.0  
DC output12v~8.3A
Power factor1
Welding voltage(DC)(V)25-30
Rate welding current DC50A - 160A50A - 180A50A - 190A50A - 230A50A - 300A
Electrode(mm)1.6-4.01.6-6.0
Noise Level (7m)db(A)77 
Engine modelS186F(E)S186FA(E)S188FB(E)S192F(E)S292F(E)
Fuel tank capacity(L)12.528
Continuous running time(hr)6.15.85.34.0 5.3
Starting systemManual/Electric startElectric start
Packing size(L*W*H)mm760*520*590760*520*6201010*630*920
Net weight(KG)110115120126.0 220

Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQ
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!
Product Tag:
Related categories:
Scroll to Top