Automatic Industry Vacuum Test Machine for RO Membrane

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 6800 ~ 7000

Description
Product Description

Automatic Industry vacuum test machine for RO membrane 

Introduction:
RO industrial membrane vacuum testing machine, by setting the vacuum up and down air pressure and up and down air pressure relief time, to automatically determine whether the product being tested is qualified, through the red and green light display, green light qualified, red light scrapped and alarm. Avoid unnecessary injuries and losses.
 

Parameters:

Machine Namevacuum test machine
ModelFSQ-01
Operating voltage, power220V/50Hz,1Kw
Control methodSiemens Small PLC Touch Screen
Detection methodTwo group Detection
Range of suitable element4040,8040,4021,2540

Main configurations:
Vacuum PumpFeiyue
Negative pressure gaugeOttonix 0-100Kpa
Negative pressure storage tanks10L
Pumping time, holding time, testing time set directly on the touch screen. Detection pressure, holding pressure negative pressure gauge setting.

Supply and installation programme:
(1)Detailed schedule from contract signing to completion of final acceptance implementation

(2)Packaging and transportation of machine

1) Machine packaging
2) Closed wooden box packaging, able to meet the requirements of waterproof, dust-proof, shockproof, moisture-proof, rust-proof, etc.
3)The packing box is clearly marked, indicating the position of the centre of gravity and the fork-lift truck forking direction, which is convenient for loading and unloading.

(3)Machine safety facilities configuration and information provision

1)Machine safety facilities
Emergency stop push-button device for the machine
Machine-related mechanical components are equipped with limit protection mechanisms
Machine programmed with relevant interlocking mechanisms

2)Technical data provision
Machine operating instructions
Electrical diagram of the Machine
Decomposition diagram of key parts of the Machine
Machine main instruments, external parts manual
Machine common parts list
Free Machine spare parts list
Free tools for use and maintenance
Include but not limited to the above information

3)  For the characteristics of manufacturing enterprises, the implementation of considerate technical services and support.
Free technical training on installation, commissioning and basic operation when machine is delivered
Professional training on maintenance and servicing for customer designated technical and maintenance personnel.
Commitment to provide lifelong maintenance services, parts supply and technical support for the machine.
Establishment of a customer care system to keep abreast of the customer's usage status and latest needs.
Occasional equipment use tracking and return visit system, free update of the latest software version. 

Machine installation, commissioning, training, warranty and maintenance:

1)Machine installation, commissioning:
Upon completion, the machine will be inspected at the seller's factory for performance and approved by both parties before delivery.
The seller will inform the buyer of the relevant delivery information one week in advance of the delivery of the machine.
Upon arrival of the machine at the buyer's factory, the buyer will notify the seller and arrange for a commissioning engineer to work together to inventory the machine and accessories according to the machine configuration within 15 working days.
The buyer shall provide the seller with the necessary installation tools and actively cooperate with the installation, commissioning and training work.
The seller is responsible for the installation and commissioning of the complete set of machine and for ensuring that the machine meets the technical specifications and functional requirements stipulated in the technical agreement and that the machine performs its normal work.
After the installation and commissioning is completed, the seller's engineer is responsible for demonstrating the functions of the machine and carrying out trial production and processing.

2)Technical training:
The seller is responsible for the technical training of the buyer's relevant personnel.
The buyer must reasonably arrange for the relevant technical personnel, process engineers, machine operators and machine maintenance personnel to attend the training and pass the assessment.
Training content: machine construction, principles, operation and use, maintenance and the programming, setting and adjustment of important functions.
Training objectives: to enable the buyer's personnel to basically master the normal production operation, programming of program control and maintenance skills of the machine and to be able to use the machine for production in its entirety.

3)Machine warranty and after-sales service
1)Machine quality assurance
After the final acceptance of the machine, the quality warranty period is 1 year for the whole machine.
During the warranty period, the seller shall bear the replacement and repair costs for faults and damage to parts caused by non-human factors.
If the machine cannot be used normally due to the machine itself, the warranty period will be extended accordingly.
2). After-sales service commitment
The seller shall provide the buyer with timely, prompt, high quality and effective technical service
The buyer shall provide timely and detailed fault information in case of machine failure, and the seller shall respond within 8 hours after receiving the relevant fault information, including oral instructions for troubleshooting and other measures.
The seller has a fixed and perfect after-sales maintenance service center and spare parts store, and the seller is responsible for providing life-long paid maintenance service and preferential supply of spare parts for the machine purchased by the buyer.

Periodic maintenance programme for machine spot checks:
Daily check
Checking partChecking programJudgement benchmarkHandling method
BarrelGum residuesAmount used/whether under one dayAdd
FilterAir pressure0.4~0.5MpaPressure adjustment
RegulatorsWater storage capacityIs it 1/3 above the low side of the containerDrainage
Radio adjustment partRatio of main agent and hardenerConsistency with glue ratiosAdjustment
Reset switchIs the delivery normalAdjustment
Mixing partMixing statusConsistency with the specified hardening rateReplace mixing tubes
Mixing of gas into the mixtureConfirming the mixture with the eyeMultiple empty spitting and defoam
Double liquid valvePoorly blocked movementVisual confirmationClear or clean
All parts of the glue tankWhether there is residual glueVisual confirmationClear or clean
TrolleyReset switchIs same of reset positioningAdjustment
Bearings, drive unitsAction: Add oilSmooth movement, oiled or notAdd oil
Action: Add oilSmooth movement, oiled or notAdd oil
Electrical circuitsWiring PartLooseness of the wiring sectionTighten again
Consumable partsO-ring breakage conditionIs it wornReplace

Commitment and Rationalization of machine:
Check the grounding measures of the machine and cabinets frequently to ensure a firm connection and normal operation of the machine.
It is recommended that abnormalities occurring during the operation of the machine be recorded in a timely manner so that problems can be solved efficiently and conveniently at a later stage of  maintenance. 
It is recommended to maintain the machine on a regular basis to prolong its service life.
It is recommended to improve the registration system for access to the server room to ensure the safe operation of the machine.
It is recommended to keep the spare parts, such as indicators, buttons, etc. in a safe place so that they can be replaced in time when the components are damaged.
It is recommended that the installation is carefully placed to prevent the doors and boxes from being deformed and affecting the aesthetics.
It is recommended to tighten the component wire crimp screws every six months to prevent loosening.
Close the door in time after operation or maintenance to prevent excessive dust from overheating of the components and damage to the service life of the components.
Connect according to the standard wiring, avoid private pulling and disorderly connection to prevent the occurrence of danger.
Check the grounding and zeroing measures frequently to ensure a solid connection.

 
Packaging & Shipping

 

Company Profile

Established in 2013, Shanghai WECOME Environmental & Technology Co., Ltd is a professional membrane technology and materials supplier with production and sales together. We are specializing in reverse osmosis membrane element solutions, including rolling machines and raw materials. We also have our own factory, which is based in 2011. We are located in International metropolis-Shanghai, known as "Oriental Paris" and "Magic Capital". All of our products comply with international quality standards and are greatly appreciated in a variety of different markets throughout the world.

Covering an area of 600 square meters, we now have over 30 employees, an annual sales figure that exceeds USD 10, 000, 000 and are currently exporting of our production worldwide. Our well-equipped facilities and excellent quality control throughout all stages of production enables us to guarantee total customer satisfaction. Besides, we have received ISO9001, ISO45001 certificates. As a result of our high quality products and outstanding customer service, we have gained a global sales network reaching Asia, Europe, Southeast Asia etc. Our company history as follows:

2013.11 Shanghai WECOME company established.

2014.03 Water treatment RO membrane tape products manufacture and market sales start.

2015.02 RO membrane automatic rolling machine design finished, and start OEM production.

2016.08 RO membrane automatic rolling machine manufacture and market sales start.

2017.03 WECOME India branch established, and start running to service local India customers.

2018.03 RO membrane permeate carrier product start manufacture and market sales.

2019.03 Strategic cooperation with Alibaba, Globe marketing sales start a new page.

2021.12 Strategic cooperation with Made-In-China, online sales start a new page again.

If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relations with new clients around the world in the near future.

Exhibition

Certifications

 

FAQ

1 Who we are?
We are specializing in RO membrane solutions, including rolling machines and raw materials, like central tube, spacer, tricot(permeate carrier), sheet, glue etc. We also have our own factory, which is based in 2011.

2 Do your products support customization? Can I put my logo on the product?
Yes, sure. We support customized logo in the product including packing.

3 How long does the delivery 40HQ container usually take?
One 40HQ container we can delivery about 15-20 days after receiving full payment.

4 Can I get a free sample? And how long does the delivery sample usually like?
Yes, sure. We can provide you free sample, you just responsible for shipping cost. We can prepare 3-5 days for sample production.

5 Where are your company? Can I visit your company?
Yes, sure. We are located in Shanghai, China. We also have branch located in Beijing, Shenzhen and India.

6 Why choose Wecome?
Not only we are a material supplier, we are also your reliable technical adviser. We have long time experience in membrane rolling market and have many years experiences of imports and exports.
 

 

Product Tag:
Related categories:
Scroll to Top