HDPE Aeroponics System Commercial Plastic Grow Tent Greenhouse Net

Min.Order: 1,000
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.1 ~ 1

Description

Product Description

Texture
HDPE+UV
Mesh number
40*25
Wire diameter
0.18mm
Weight per square meter
80
Width
1-20m
Length
10-100m
Colour
white/transparency/black/green/red/blue/purple/yellow/pink
Craft
weave/cutting/sewing/packaging
Lifespan
3-5 years
Application
insect net/breed aquatics/bird net/hail net

Detailed Photos

Good material
 
 
Polyethylene material,high tensile strength,durable

Uniform mesh
 
 
Mechanical weaving,smooth and bright surface
Mechanical weaving
 
 
Tight, sturdy, easy to cover and easy to use

Application

Packaging & Shipping

Company Profile

Qingzhou Xinhe Greenhouse Gardening CO.,LTD located in Shandong Province, Qingzhou Xinhe Greenhouse Horticulture Co.,Ltd has focused on greenhouse designing, manufacturing and construction for over 12 years. In the passing years, Xinhe Greenhouse helps our customers from China and overseas markets build hundreds of different types of greenhouses for vegetable planting, flower planting and many other uses.
 

FAQ

1.How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 10-60days.

2.How long  is the warranty period?
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc.

3.Is your company foreign trade company or manufacturer?
we are manufacturer.

4.Can you supply sample?
Small parts can be supplied, but you should pay the express.

5.Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract.

6.  How to install greenhouse?
First we prepare the material and export.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you.

7.When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication.

8.What is the payment terms?
usually the deposit is 30%-50% of total value. Before loading, all the balance should be paid off. Or you can give your own payment terms, then we can negotiate it.

Product Tag:
Related categories:
Scroll to Top