3000L Large Beer Brewery Equipment Brewing System Brewhouse Mico Brewy Beer Brewing Equipment Turnkey Project

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 80000 ~ 200000

Description

Product Description

3000L 5000L large brewery turnkey brewery beer factory brewing equipment for sale

Branch item

Components

1. Milling system

Malt miller

Grist hopper

Screw conveyer

Hydrator

2. Mashing system/Brewhouse

Mash tun

Lauter tun

Kettle

Whirlpool

Heat exchanger

Wort pump

Steam boiler

Other accessories are available:

1. Sanitary pump, pipeline and valves;

2. Operating platform;

3.Soft pipe;

4.Electronic scale;

5.Sugar measuring cylinder/Refractometer;

6.Yeast dosing tank;

7.Venruri tube

3.Fermenting system/Fermentation system

Fermentation tank

Bright Beer tank

Other accessories are available:

1. CIP pipe; 2. Ladder ; 3. Hop inlet; 4. Lifting ears; 5.PVRV; 6.Sample valve and butterfly valve; 7. Solenoid valve; 8. Cooing pipe

4. Cooling system

Glycol tank

Refrigeration machine/Refrigerator

Evaporator

Pump, pipeline and valves

5.CIP system

Soda solution tank

Sterilization tank

Pump and valve

Control panel

6.Filter system

Kieselguhr filter/Diatomite filter

Membrane filter

Bright beer tank

7.Packing system

Fresh keg packing machine

Glass bottle packing machine

Pop can packing machine

8.Controlling system

Mashing control panel

Fermenting control panel

Refrigerating control panel

 
Hot Products
Company Profile

Our Advantages

Packaging & Shipping


Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

 
FAQ

Our service for you:

1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
    your brewery;


2. Professional engineers going abroad for the installation ,debugging, and training, all the
    travelling cost and locate food, and hotel shall be afforded by the buyer


3. The installation period is about 15 days including assembling brewing tanks and training the
    operator.  It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer
    for the extended installation.


4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication
    method available to the customer.


5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should
    be installed separately. If needed, cost calculate additionally.


6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.
Product Tag:
Related categories:
Scroll to Top