Color Can Be Choose:
1. According To Customers' Requirement: We Can Do One Side Color Coated Cooling Pad or The Full Set Colors for Easy Cleaning and
Beautiful Appearance
2. Color is For Option: Brown/ Green / Yellow / Red/ Blue/ Orange full color or Black/Yellow/Green./Blue/Red Coated;
The water flows down the corrugated surface of the evaporative cooling pad. Part of the water is evaporated by the warm and dry air that passes through the pad. The rest of the water assists in washing the pad, and is drained back to the pump station through a gutter system.
The heat that is needed for the evaporation is taken from the air itself. The air that leaves the pad is therefore cooled and humidified simultaneously without any external energy supply for the evaporation process. This is nature's own cooling process.
The cooling pad use Export standards for packaging. we can also packaged by customer's request. if you need the cooling pad, please contact me now!
Qingzhou Xinhe Greenhouse Gardening CO.,LTD located in Shandong Province, Qingzhou Xinhe Greenhouse Horticulture Co.,Ltd has focused on greenhouse designing, manufacturing and construction for over 12 years. In the passing years, Xinhe Greenhouse helps our customers from China and overseas markets build hundreds of different types of greenhouses for vegetable planting, flower planting and many other uses.
1.How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 10-60days.
2.How long is the warranty period?
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc.
3. How to install greenhouse?
First we prepare the material and export.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you.
4.When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication.
5.What is the payment terms?
usually the deposit is 30%-50% of total value. Before loading, all the balance should be paid off. Or you can give your own payment terms, then we can negotiate it.