Summary:
FLN-40.5 load break switch use SF6 gas as arc extinguishing and insulating medium. There are three work stations: opening, closing and grounding in the switch.
It has small volume, installing easy-to-use, strong environmental adaptability and other characterist.
Ambient condition:1.Altitude: ≤2000m
2.Ambient temperature: -40°C ~+40°C
3.Earthquake intensity: ≤8 degree
4.Relative humidity: Daily averages ≤95%, Monthly average≤90%Parameters:Item | Unit | Data |
Rated voltage | kV | 40.5 |
Rated frequency | Hz | 50 |
Rated current | A | 630 |
1min Power frequency withstand voltage | wet | kV | 95 |
dry | 95 |
Lightning impulse withstand voltage | kV | 185 |
Rated short circuit breaking current (peak) | kA | 20 |
Rated activeload and close circuit breaking current | A | 630 |
Rated transferring current | A | 630 |
Rated short circuit making current (peak) | kA | 63 |
Rated cable(line) charging breaking current | A | 10 |
Cable charge breaking current in earthing fault | A | 30 |
Rated withstand current (peak) | kA | 63 |
Short time withstand current (2s) | kA | 25 |
Mechanism life | times | 5000 |
FAQ:Q: Could I have prices of your products?
A: Welcome. Please feel free to send us inquiry here. We will reply you within 24 hours.
Q: Can I get a sample before the bulk order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q: Can we print our logo/ company name on products?
A: Yes, of course, we accept OEM, then need you to provide brand authorization to us.
Q:Do you accept product customization?
A:Yes, of course, please provide specific drawings or parameters, we will quote you after evaluation.
Q: What is the lead time?
A: The lead time depends on the quantities ordered, generally within 7-20 days after receiving the payment.
Q: What is your Trade Terms?
A: We accept EXW, FOB, CIF, FCA, etc.
Q: What is your payment method?
A: We accept T/T, Western Union, Paypal, etc.
Q: Do you inspect the finished products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping. And we will provide goods inspection reports for your reference before shipment
Q: How to solve the quality problems after sales?
A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.