CE Certificated SUS304 Stainless Steel Cargo Shower Room with Seal Quick Shutter Rolling Door

Min.Order: 1
Product origin: Wuxi, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 3800 ~ 8000

Description
Product Description

The PVC Rolling Door Cargo Shower Room is convenient for the forklift to carry large cargoes into, without the operator getting off to open and close the door, and the automatic induction lifting.

It meets the ISO5 standard and is made of all stainless steel. It is equipped with centrifugal fan and the HEPA filter. The product is characterized by simple operation and convenient maintenance. At the same time, we can custom air shower rooms for people and goods with electronic interlocking and infrared induction devices according to customers' needs.
 
ModelBD-PVCAS2000 More
Outside Dimension W*D*H
(mm)
2100*2000*2100Support customization


contact us
Inside Dimension W*D*H
(mm)
1600*1900*1950
Number of Stain Steel Nozzles
(pcs)
24
Air Velocity25-35m/s
Noise<60db
Filter Size
(mm)
600*600*80
Filter Efficiency99.995%@0.3um
Motor Power
(W)
1.5KW
Number of Lights  
(pcs)
2
Power Supply380V / 50Hz
Air nozzle

Our air nozzles is made of stainless steel and can rotate 360 ° without dead angle to help you create a thoroughly clean environment.

Infrared Sensors

So when someone enters or leaves the shower room, infrared sensors can automatically sense and send signals to the control system.
The HEPA filter

Our products use high efficiency filters to help you thoroughly purify the air.
Packaging & Shipping

Company Profile

FAQ

1. Could your machine meet our custom made ?

We will supply you a proposal as to your specific requirement, and each machine is customized to satisfy customer's need well.

 

2. Are you a factory or a trading company?

We are the manufacturer, and engaged in Pharmaceutical Machinery for more than 5 years.

 

3. What's your payment way?

If the machine is in stock. 100% payment by T/T , Alibaba's trade assurance service.Western Union , Money-gram.

If the machine should be re-produced, 30% deposit, 70% before shippment.

 

4. How can you ensure the machine's quality after we put the order?

Before the delivery, we will send you machine's pictures and videos, or you can come to us to have the quality checking by yourself, or by the third party inspection organization contacted by your side.

 

5 How long is the machine delivery time ?

Usually the delivery time is 15-20 days after we receive the deposit 30%.

 

6. Does your company have the warranty period ?

Yes, One-year warranty period for whole machine except of tubes and human factors etc, and 12-month of  after-sale service from the date when you receive machine or 12 months when installation finished. 

Product Tag:
Related categories:
Scroll to Top