The Secoroc 250 is a highly efficient pusher leg rock drill. It is mainly used in either rock drilling work such as mining and tun-neling, or in railway, water conservancy construction projects and stone work. It is suitable for wet drilling on hard medium hard rock, or for drilling horizontal or inclined blast holes. Secoroc250 can be equipped with pusher leg Secoroc250JL.
(S250 jackleg Drill) has been the preferred choice of miners who demand high performance, superior control and lasting reliability. the S250 jackleg allows operators to drill in confined spaces with challenging drilling directions while providing high drilling speeds and strong torque even at low air pressures. Push leg controls are integrated into the rear end of the rig to maximize safety and comfort. jackleg has a large contact area between the main cylinder components to reduce impact pressure and increase product life.
Function:
High penetration rate and strong torque even at low air pressure
Minimum downtime and low maintenance cost
Ergonomic controls integrated into drill backhead
Pusher leg controls with push button jackleg retraction
Motorcycle control feed
Available in various configurations - sinker, stopper, and jackleg
Market leader in North & South America
Parts interchangeable with SHENLI S250 jackleg drill
Features:
High Durability Long Life
Alloy steel forged parts provide maximum durability.
Removable bushing to protect wear of front head.
Ergonomic Series Available
Anti-vibration handle and noise reduction muffler are available for workers healthcare.
Other Features
Forged latch retainer for quick chisel change.
Multi position throttle for smooth start-up in drilling.
Application areas:
Mining, traffic, tunnels, water conservancy construction, quarries and other work
Weight | 33.5 kg |
Air consumption @6 Bar | 83 l/s |
Drill Steel Chuck Hex | 22x108 mm |
Piston diameter | 79.4 mm |
Stroke length | 67.7 mm |
Air Hose Connection | 25 mm |
Water Connection | 13 mm |
Impact rate (BPM) | 2300 |
pneumatic air leg rock drills before use
1,Check the integrity and rotation of all parts (including rock drill, bracket, or rock drill cart) before drilling, fill necessary lubricant, and check whether the wind and waterways are smooth and whether the connection joints are firm.
2,Knock on the roof near the working face, i.e. check whether there are live rocks and loose rocks on the roof and second gang near the working face, and make necessary treatment.
3, the working surface of the flat shell hole location, is to be pounded flat in advance before allowing rock drilling, to prevent slippage or shell hole displacement.
4. It is strictly forbidden to drill dry eyes, and we should insist on wet rock drilling, turn on the water first and then the wind when operating, and turn off the wind and then the water when stopping drilling. When opening the hole, run at low speed first, and then drill at full speed after drilling to a certain depth.
5,No gloves are allowed to be worn by the drillers when drilling.
6,When using the air leg to drill the hole, pay attention to the standing posture and position, never rely on the body to pressurize, let alone stand in front of the rock drill under the work brazing rod, to prevent injury from broken brazing.
7,If abnormal sound and abnormal water discharge are found in rock drilling, stop the machine for inspection and find out the reason and eliminate it before continuing to drill.
8,When withdrawing from the rock drill or replacing the brazing rod, the rock drill can run slowly and pay attention to the position of the rock drill braze.
1.How do your prices compare to the manufacturer/factory?
We are the main distributor of major construction machinery manufacturers/factories in China and keep getting the best dealer prices. From the comparison and feedback from many customers, our price is even more competitive than the factory/factory price.
2.How is the delivery time?
In general, we can deliver ordinary machines immediately to our customers within 7 days, as we have various resources to inspect stock machines, locally and nationwide, and receive machines in a timely manner. But it takes more than 30 days for a manufacturer/factory to produce an order machine.
3.How often can you respond to customer inquiries?
Our team is made up of a group of hardworking and dynamic people who work around the clock to respond to customer inquiries and questions. Most issues can be successfully resolved within 8 hours, while manufacturers/factories take longer to respond.
4.Which payment methods can you accept?
Usually we can use wire transfer or letter of credit, and sometimes DP. (1) Wire transfer, 30% deposit in advance, 70% balance paid before shipment, long-term cooperation customers can present a copy of the original bill of lading. (2) Letter of credit, 100% irrevocable letter of credit without "soft terms" from internationally recognized banks can be accepted. Please seek advice from the sales manager you work with.
5.Which clauses in the Incoterms 2010 can you use?
We are a professional and mature international player and can handle all INCOTERMS 2010, we usually work on regular terms like FOB, CFR, CIF, CIP, DAP.
6.How long are your prices valid?
We are a gentle and friendly supplier, never greedy for profit. Our prices remain largely stable throughout the year. We will only adjust the price according to the following two situations: (1) USD exchange rate: According to the international currency exchange rate, the RMB exchange rate is quite different; (2) The manufacturer/factory adjusted the machine price due to the increase of labor cost or raw material cost.
7.What logistics methods can you use for shipping?
We can transport construction machinery with various means of transport. (1) 80% of our shipping will be by the sea, to all major continents such as Africa, South America, Middle East. (2) China's inland neighboring countries, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan, Turkmenistan, etc., can transport by road or rail. (3) For urgently needed light spare parts, we can provide international express services, such as DHL, TNT, UPS, FedEx, etc.