WJ-1 Diesel Engine LHD Loader Underground Mining Rock Transportation Scooptram

Min.Order: 1
Product origin: Yantai, Shandong, China
Infringement complaint: complaintComplaint
US$ 51000 ~ 64000

Description
Product Description

WJ-1 is a compact and lightweight Load Haul Dump (LHD) for narrow vein mining, easy to operate and maintain, and it features an operator compartment that is located in the rear frame of the machine to ensure increased operator safety. The WJ-1 is full of features to help mines maximize tons and minimize extraction costs. It has been engineered to optimize machine width, length, and turning radius, enabling operation in narrower tunnels for less dilution and lower operational costs.

DimensionPerformance
Overall Size5850(6050)*1300*2000Speed0~8km/h
Min. Ground Clearance200mmBoom Raising Time≤3.8s
Max. Lift Height3250mmBoom Lowering Time≤1.9s
Max. Unloading Height1050mmDumping Time≤2.5s
CapacityWeight
Bucket1m3(1.5 yards)Operation Weight6750kg
Payload2000KGLaden Weight8750kg
Max Breakout Force45KNFront Axle(Empty)2230kg
Max Traction50KNRear axle(Empty)4520kg
Climbing Ability(Laden)20°Front Axle(laden)5050kg
Axle Oscillation Angle±8°Rear Axle(laden)3700kg
EngineAxle
EngineDEUTZ D914L04 / 58kwBrandDALI
DEUTZ BF4L914 / 66kwModelPC-15-B F/R
EmissionEURO II / Tier 2TypeRigid planetary axle
TransmissionTire
TypeHydrostaticModel10.00-20 PR14 L-4S
PumpANFOSS T90MaterialNylon
MotorSAUER MV23  
Main Features
Structure
The frames are articulated with a 38° steering angle
Ergonomics Canopy with side seat to provide broad operation vision

Operation Comfort & Safety
4 wheels driving & braking
The combination design of the parking brake & working brake ensures good braking performance. The braking model is SAHR(spring applied, hydraulic release)
Axles are equipped with differentials. The front is NO-SPIN while the rear is standard
Hydraulic Joystick control to reduce the labor intensity of the driver
 
Early Warning & Maintenance
Automatic alarm system for oil temperature, oil pressure, and electrical system
 
Energy-saving & Environment Friendly
Germany DEUTZ engine, powerful & low-consumption.
The Hydrostatic transmission system, high efficiency, and low energy consumption
The Catalytic purifier with silencer greatly reduces air and noise pollution in the working tunnel

Operator's Compartment
Canopy
Floor washable with water to reduce dust
Low-frequency suspension seat
 
Dashboard & Displays
Critical warnings and alarms Displayed as warning lights
Instrument Panel Electric gauges
Instrument Panel Illuminated switches
 
Frame
Rear & Front Frame
High strength welded steel structure with optimized material thicknesses
Tanks Bolted & Welded
 
Bucket
Bias 450(anti-wear)Material
Type V shaped(reduce resistance)
 
Hydraulic
Filling pump for hydraulic oil
Oil cooler for hydraulic oil
120L Hydraulic oil tank capacity
Meter oil level
Hydraulically operated, center-point articulation, power steering with one double acting cylinder. Steering is controlled by a hydraulic joystick.
Gear type Steering and servo hydraulic pumps
The oil flow from steering hydraulic pump is directed to bucket hydraulics when steering is not used. which can enlarge the working pressure.
Joystick bucket and boom control(hydraulic), equipped with gear pump that delivers oil to the bucket hydraulic main valve.
Straight Boom system with one lift cylinder.
Dump cylinder 1pc
Service brakes are spring applied, hydraulic released multidisc wet brakes on all wheels.
Two independent circuits: one for the front and one for the rear axle. Service brakes also function as an emergency and parking brake
 
Electric
Alternator 55A / 28V(varies for different engine)
Batteries 2 x 12V
Starter 4kW / 24 V
Driving lights
2 in front 24W(Canopy), LED lights
2 in rear 18W, LED lights
 
Optional
Engine Fire Suppression
Auto lubrication System
Remote Control System
Closed Cab With Air-Conditioning
Side dump bucket
Bucket teeth
Protect tire chain
Flashing beacon
Reverse alarm

Company Profile

Qixia Dali Mining Machinery Co., Ltd was established in 1998, located in Yantai City. The factory covers an area of 130, 000 square meters. The total number of employees is more than 200, of which 90 are technicians and engineers. The company is mainly engaged in the design, development, production, installation, and training of underground mine equipment and ore processing equipment, spare parts supply, and sales.

Our company mainly produces underground equipment, such as scooptram, mining truck, mine locomotive, mobile rock splitter, scaler, etc. With 20 years of research and experiments, our equipment has been large-scale and intelligent and can achieve remote control. The main underground equipment has passed the national mine product quality and safety certification. In addition, our company can also provide EPCM services for all kinds of non-ferrous metal, ferrous metal, and non-metallic mines. Up to now, our equipment has been exported to more than 80 countries in the world, serving hundreds of mining projects. As a key government-supported enterprise, the company has been awarded "Specialized New Enterprises" and "High-tech Enterprises" in Shandong Province. Over the years, we adhere to the principle of customer first, strive for excellence, and wholeheartedly provide customers with high-quality equipment and service.

FAQ

1. Are you a factory or trade company?
We are a manufacturer, we also supply trade service.

2. Will you provide some wearing parts of the machines?
Yes, of course. We ship them with the machine and spare parts in wooden boxes.

3. How is the quality of your products?
We have been approved by ISO and CE, and always produce our products strictly according to national and international standards. We do strict inspections in every production stage, and all the machines we sell are under warranty.

4. What about your price?
We always supply our products at a reasonable price to build long-term business and earn a good reputation.

5. What payments term do you accept?
We accept L/C, T/T, and other ways like D/A and D/P, etc, T/T goes with 30% advanced payment after signing the contract or order confirmation.

6. What about the order lead time?
We have two factories and big productivity, the order lead time is only 15-20 days.

Product Tag:
Related categories:
Scroll to Top