Aluminium Tube Filling and Sealing Machine for Acrylic Paint Oil Paints

Min.Order: 1
Product origin: Wenzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 10000 ~ 30000

Description
Product Description

Introduction:

This high-tech tube filling sealing equipment is optimized design and developed by our company based on introduction of advanced technology from abroad and combines GMP requirement.

This machine adopts PLC programmable controller, which is suitable for tube packaging of liquid, paste, high viscosity fluid and other materials fully automatically working from tube feeding, filling, sealing, date printing, final product output. It is an ideal Alu/Plastic/Composite tube filling sealing machine, which is widely used for cosmetics, pharmaceutical, food, adhesive and other industries.

 

Machine Features:

1.High grade operation screen with LCD display and PLC control, easy operation and more humanization By stepless speed adjust, parameter setting, output count, pressure index and failure display.
2.Automatically workingfrom tube supply, photocell register, inert gas filling (optional), material filling and sealing, batch number printing, final products output.
3.High prevision photocell register, that reduces the chromatic aberration scope.
4.Adjustment parts external in position, position digital display, convenient and accurate adjust (suitable for variable products production).
5.Mechanical, photoelectrical, electric, pneumatic integrative controlling, reaches no tube no filing function: auto alarming if tube error positioned or pressure too low, it will automatic stop while open the protective door.
Main Technical Parameter:


Samples

Packaging
Workshop
FAQ

Q: About payment terms

A: T/T 30% of total amount as the deposit, balance 70% by T/T before shipment. 100% of irrevocable Letter of credit at sight is also acceptable.

 

Q: About guarantee time

A: One-year warranty except ultrasonic pasting mold and lifelong service. Malfunction caused by human error operation, not covered by the warranty.

During guarantee period, the cost of spare parts should be borne by us, but the freight for delivery of spare parts will be on the buyer's account.

 

Q: About delivery time

A: about 40-50 working days after receiving the deposit payment and mold drawing confirmation.

 

Q: About installation & training

A: We will dispatch one technician go to buyer's factory for on-site installation and training for five days. The buyer needs to pay $100 per day for the technician as the salary. All other expense, such as visa and round-trip tickets, food and accommodation etc will be on the buyer's account. 

 

Q: About package

A: Wrapping by PE film with fumigation free wooden pallet or case.

Product Tag:
Related categories:
Scroll to Top