Hikelok Pressure Reducing Valve SS316

Min.Order: 1
Product origin: Chengdu, Sichuan, China
Infringement complaint: complaintComplaint
US$ 150 ~ 600

Description
 
 Stainless Steel 800 PSI Back Pressure Regulator 



Features:
 
Economical, compact design
 
Piston sensed design is safe and reliable
 
Available in a Stainless Steel or Brass design
 
Optional gauge ports and panel mounting
 
Flow capacity Cv=0.10
 
Low handknob torque for easy operation
 
Bubble-tight shutoff at all reseating pressures
 
Operating Parameters:
 
Maximum Inlet Pressure
800 psig (55.1 bar)
 
Controlled Pressure Ranges
40-150 psig (2.75-10.3 bar), 40-300 psig (2.75-20.6 bar), 100-700psig (6.89-48.2 bar), 100-800 psig (6.89-55.1 bar)
 
Design Proof Pressure
150% maximum rated
 
Leakage
Bubble-tight
 
Operating Temperature
PCTFE: -15°F to 140°F (-26°C to 60°C)
PEEK: -40°F to 392°F (-40°C to 200°C)
PI: -40°F to 250°F (-40°C to 121°C)
 
Flow Capacity
Cv=0.10

 



 


Company Introduce:
 

 
Introduction of Hikelok® Brand
1.Established time: in 2011
2.Experience/Advantage:focused on precision fluid fittings and valves for more than 10 years.We enjoy a good reputation in the foreign business .
3.Product's style is similar to well-known brand Swagelok ®and Parker ®.
4.Products introduction:
the main products of hikelok include ball valves,needle valves,instrument manifolds,bellows valves,
check valves,twin ferrules series tube fittings,instrument pipe fittings,weld fittings and other kinds of instrumentation valves and fittings.
5.Body materials: stainless steel,alloy steel, brass,special alloy and carbon steel
6.Standard products:ANSI,ASME,ASTM,API,MSS,ISO,EN,GB,JB,HG ect.
7.Application:
widely used in power generation,petroleum,petrochemical,natural gas, semiconductor,laboratory,shipbuilding, steel,chemical industry and other fields
8.Certificate:ISO9001 ,2015;ISO14001;ISO45001;ABS;CE

 


Certifications:

ISO9001 ,2015;ISO14001;ISO45001;ABS;CE
 

Our Services
 
From quote to delivery, we can provide the detailed support you need:

1. CAD drawing
2. P&ID
3. Component selection
4. Bill of material
5. Professional services such as bending and welding
6. Testing to guarantee the system
7. Professional packaging and delivery
8. Give you solution within 24 hours
Scroll to Top