Long Service Life 20FT T75 ASME Standard Lox Lin Lar LNG Lco2 ISO Tank Container for Sale

Min.Order: 1
Product origin: Zhengzhou, Henan, China
Infringement complaint: complaintComplaint
US$ 43000 ~ 45000

Description
Product Description

Long Service Life 20ft T75 ASME Standard LOX LIN LAR LNG LCO2 ISO Tank Container for Sale

Tank containers can be 20/30/40 feet in size. Tank container volume mainly has 20/22/25/30/35/40/45/50/55cbm. Basic equipment includes side outlet, double-side loading and unloading, double pump box, double tool box, safety valve, temperature gauge, pressure gauge, emergency shut-off valve, fire extinguisher, static protection grounding belt, etc. For the safe use of liquid nitrogen products, we have carried out a number of tests on the liquid nitrogen tank, such as weld density test, heat treatment, water pressure measurement, and ray non-destructive testing.
 
Codes and regulations:
RID/ADR, IMDG, ASME VIII DIV 1-2017Ed; TIR;UIC;CSC;TC;FRA;CFR49;ISO 1496/3;ISO Standard 1161
 
Product Parameters
Main material Cover
inside tank   SA-240M 304
Main material Cover
outside tank    Q345R
Tank Shape
Column Shape,Horizontal
Nominal Medium
20500L
Gross mass(kg)
34000
Tare Weight(kg)
11050kg
Filling ratio
95% / 85%
Max. Allowed Working Pressure
16Bar
Design Pressure
22Bar
Baffles of the inner vessel
Two transvers baffles
Design temperature(ºC)
-196 to 50
Type of insulation
High vacuum multi-layer
Valve types for cryogenic tanks
cryogenic valves
Safety Valve
DN25 PN2.5 DAH-25A1
Vaporator
DN25
Top inlet pipe
DN40
Bottom inlet/outlet pipe
DN40
Reflux tube
DN40
Liquid level gas phase tube
DN10
Liquid level liquid phase tube
DN10
Monitoring tube
DN10
Overall Size(Frame)/L*W*H/mm
6058*2438*2591
ISO-cornercastings
20'x8'x8'6" ISO dimensions
 
Detailed Photos


 

Our Advantages

1.This frame tank container should carry out all kinds of the test according to the GB / T16563-1996 and China Classificationm Society "Container Inspection Code".

2.Except for the pictures' mark, the type and size of the welded structure shall be in
accordance with GB / 985.1. The height of the weld foot and weld fillet is according to the thickness of the less thinner steel plate.There should not be crack, slag, porosity, or undercut, etc. on the surface of the welded joint.Weld seam surface will be inspected through the magnetic powder or penetration testing (preferred magnetic powder). Meet NB / t47013.4 (5) -2015, Class I qualified.
3.The accessories for this tank container shall meet the corresponding standards of product quality certification,which can be carried out the air tightness test together with the tank after passing the re-examination and form a complete set then delivery from the factory;
4.Valve opening operation,should be able to withstand the pressure of the air tightness test , fully open, fully closed, flexible operation, no abnormal resistance, idling and so on;
5.All signs, brand names, stickers will be made according to the drawings after the competion of the painting; The area around the signs, brand names and rivets will be sealed with the sealant.
6.The vertical plane of the longitudinal centerline of the tank container shall be coincident with the vertical plane of the longitudinal centerline of the frame. The offset shall not exceed 5mm.
7. All supports of the connections between the tank and the frame should be thin welding, and welding firm and reliable, the weld seam surface shall not have cracks, undercut, stomatal, crater and splash.
8. Tank coating in line with the relevant provisions of JB / T4711-2003. After complete cleaning the rust of the outside carbon steel surface of the tank,coated two anti-rust primer, two white finish.
9. The tank needs to be replaced with nitrogen or vacuumed before leaving the factory.
(1) the use of nitrogen replacement treatment, the oxygen content after treatment is less than 3%, and keep the residual pressure 0.05Mpa ~ 0.1Mpar;
(2) the use of vacuum treatment, the vacuum after treatment is not less than 0.086Mpa.1010. Emergency cut-off device should be installed before the air tightness test, the test medium is air, the test pressure is 0.1Mpa;After the installation is complete,Emergency shut-off device should be done through emergency cut off and filter protection test, gas valve, liquid valve and boostervalve completely closed in 5S qualified, air source control valve rotation flexibility, no jamming phenomenon.

 

 

Our workshop

Packaging & Shipping
                           LNG T75 tank container                                           powder tank container                                                  storage tank
                    Customized asphalt tank container                                                         T11                                                                                 T50
 
FAQ
 

Welcome inquiry anytime to get best offer !

1.Payment term: 100%T/T or LC payment

100%T/T, 30% deposit for production, pay the balance 70% before the shipment.
 
2. Warranty : 12 months

No warranty for consumable parts, but we will send you free consumable parts, on-board tools, wires, lamps, etc. before the shipment.
Free consultation service for life.
Technical repair and guidance questions, engineers can come to service

3.Delivery time: 15-45 working days
Check if the product is in stock or sufficient raw materials
Normal quantity order delivery time is 15 working days
Big project need to check request delivery time and delivery details required

4.Services
Welcome to visit our factory at any time
Order confirmation, drawing confirmation, details and requirements confirmation.
Production photos and videos are updated to customers every week
24 hours online for consult
Provide support for post-parts demand, factory price direct delivery.

5. LOGO & Color: 
factory recommend or as your request.

6.Quality control: 
Our welding workers who have international welding certificate with good technically.We have QA&QC control in each production link, and will continue production after passing the inspection.
Various production line processes.


 

Product Tag:
Related categories:
Scroll to Top