ST043 OEM Alloy Round Pipe Tube Fence Post Seamless and Welded Steel Pipe

Min.Order: 20
Product origin: Tianjin, China
Infringement complaint: complaintComplaint
US$ 1300 ~ 1500

Description
Alloy Round Pipe Tube Fence Post
Product introduction
CommodityCarbon Steel Pipe And Powder Coated Tube 3 Meter And 6 Meter Long
Square TubeCustomizable
Wall Thickness0.5~50.0mm
LengthMax. 6.4m
Steel GradeS235jr/S355jr/S355joh/S355j2h;Stk400/Stk500
Zinc Coating40GSM-600GSM
MOQ20 Tons
SurfaceEpoxy powder coated, color as per Ral. Card
End finishPlain end
UsageSteel construction, Fence Post, Mechanical, Manufacturing, Construction, Automobile Manufacturing, Ship building, Electricity and more

Powder coated processing instruction:
The surface of the tubes/pipes/ posts are sprayed with electrostatic powder to improve the anti-corrosion performance of the product, which is both beautiful and durable. The powder used in electrostatic spraying is provided by the world-renowned paint supplier nobel-aksu of the Netherlands.Colorful, excellent anti-corrosion performance, according to the RAL color card for customers to customize different colors of the steel  products.

 
QUALITY CONTROL 

1)Before Shipping ,Our professional Inspectors Will Check
  The Pipe's Diameter,Thickness,Length, Chemical Composition, Mechanical Properties,Zinc Coating  etc,

  Everything is Ok,Then Will Shipping and Supply a MTC With Full Information .

2) Support The Third Party Inspection ,SGS, BV and Others.

1.20 years experience in steel and sheet metal fabrication
2.Advanced precision machinery
3.Reliable reputation in business
4.Engineering team turn your sample,design or idea into products



FAQ:
Q: Are you trading company or manufacturer ?
A: We have our own factory in Baodi District, Tianjin, China.

Q: What is your minimum quantity order?
A: As trail order, 20 tons are ok.

Q: Do you provide sample? Is it free or extra ?
A: Yes, we can provide the samples of fence post or round pipe. All the sample cost will be refunded after you place the order.

Q: What is your terms of payment?
A: 30%-50% T/T for deposit, balance before loading.

Q: What is your after-sale service?
A: After we deliver the goods, we will send the detailed drawings, installation instructions and packing list to tell you how to install. For any problems during installation, you can contact us at any time. 


Any discussion about steel processing, welcome to contact us.
Product Tag:
Related categories:
Scroll to Top