High quality/High cost performance ATV Drive Belt 2005 - 2013 Kawasaki Brute Force 650 4X4 OEM Part Number (s) : 3201-242, 59011-0019, 59011-0003

Min.Order: 50
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 17 ~ 30

Description



 
   
   


OEM are welcomed
Printing can be designed as customers' demand

Doble Sided V Belt (XTX,ATV, UTV)is our new developing product.

All dimensions will be produce accroding to samples.

Could be anti-frintion, anti-col, anti-oil.,etc.

 

Built for the most extreme machines, XTX ATV and UTV belts are engineered for machines powered by 800cc and above engines.  Engineered with specially-formulated, high temperature polychloroprene with the highest level of aramid fiber reinforcement available, the XTX belt delivers track-churning performance for the most aggressive riders.  This innovative break-through design features deeper cogs on top and rounded cogs on the bottom for ultimate flexibility and longer belt life while being a better alternative to the original equipment belt.

 

XTX ATV belt offers:

• Faster and more consistent throttle response at high speeds

• Quicker throttle response at mid-speed acceleration 

• Greater secondary acceleration at high RPMs 

• Reduction in slippage during the highest levels of torque 

• Increased horsepower capacity 

• Better performance during deceleration (more responsive engine braking)

• Tested and proven reliable at well over 12,000 RPMs

• Cooler running than the leading competitors



OTHER   PRODUCTS 

FACTORY  SHOW


FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.


 
Product Tag:
Related categories:
Scroll to Top