Material | Aluminum alloy: ADC12, ADC10, A360, A380, A356, 6061, 6063 |
Magnesium alloy: AZ91D, AM60B, Zinc alloy: ZA3#,ZA5#,ZA8# | |
Processing Craft | Drawings→ mould making → die casting →rough machining → CNC machining→surface treatment →product checking→ packing →delivery |
Tolerance | ± 0.02mm |
Surface Treatment | Electroplating, Electrophoresis, Anodization, Polishing, Sandblasting, Passivation, Powder coating, Spray painting, Etc. |
Inspection | 1.Foundry in-house: 100% inspection on critical dimension; 100% on appearance. |
2.Third Party inspection available upon requirement | |
Mainly Testing Facility | Three-dimensional measuring instrument (CMM), Salt spray test box, Dynamic balance detector, Pneumatic detection |
Features & Advantage | 1.High machining accuracy, the flatness within 0.1mm. |
2.High strength and not easy to deform, has good electrical and thermal conductivity. | |
3.High finish appearance,smooth surface roughness is Ra1.6 after machining. | |
4.No granules, no spots and no painting peel off in appearance. | |
5.Smooth appearance, corrosion resistance. | |
6.Pass 20000 Times Wear Resistance Test. | |
Standard | 1.Aluminum alloy: ISO3522-84, ASTMB85-96, JISH5302:2000, EN1706:1998 |
2.Magnesium alloy: ISO/DIS16220-1999, ASTMB93/B93M-98, EN1754-1997 | |
3.Zinc alloy: ISO301-1981,ASTMB327-98, JISH2021:1999, EN12844:1998 |
Q: Does your company belong to a manufacturing company or a trading company?
A: We are industrial component manufacturing company.
Q: What is your company's R / D ability?
A: We have a 10-persons R&D department responding for the design of a mold or production technology.
Q: What is the quality control of your company?
A: Our company has the system certification of ISO9001. We have special product laboratory and measurement room, and have very professional testing & measuring equipment. We do raw material incoming inspection, in-process product quality control and outgoing goods quality control.
Q: How long will the quotation be completed normally in your company?
A: According to different products, consider whether the common materials used and how the processing precision, and in general,the quotation will be completed in 1-2 days.
Q: What is lead time for mold delivery normally?
A: Depends on different product type, the delivery lead time will be 4 to 6 weeks normally after mold design drawing confirmed.