Steel Corspan Roofing Sheet Making Machine Water Waves Roof Corrugated Roll Forming Machine is one most popular type of roll forming machines. It makes different shape of color steel roof sheet, which is used for buildings, factory, supermarket ect. For this machine, it suits thickness range is from 0.20mm to 0.60mm PPGI,GI sheet. We adopt 16mm thick wall board to make machine frame strong and beauty. Usually it can run with the speed to10-15m/min, PLC with touch screen operation make the machine simple and easy for usage.
Configurations | manual decoiler, guiding platform,main machine of roll forming, cutting device, electric motor,hydraulic station, PLC control system | |
Material | Raw material | PPGI, GI Sheet |
Coil width | 914mm/925mm/1000mm/1200mm/1220mm | |
Thickness | 0.20mm-0.60mm | |
Manual Decoiler | Inner Diameter:450-550mm | Expand by manual |
Outer Diameter: max 1500mm | ||
Max Coil width:1250mm | ||
Capacity: 5T | ||
Main Machine | Number of Forming steps | 18 steps |
Shaft diameter | 70mm solid shaft | |
Design type | Middle plate welded | |
Machine frame | 350# H steel welded | |
roller material | 45# steel, surface hard chromium plating. | |
shaft material | 45# steel | |
Work speed | 10-15m/min | |
Transport | By chains | |
Power of main machine | 5.5 kw SHANGHAI LICHAO | |
Type of cutting | Hydraulic guide pin cutting | |
Cutting tolerance | ±1mm | |
Cutter | Gcr12MOV | |
Cutter quantity | 1 set | |
Working pressure | 20MPA | |
Hydraulic system | Hydraulic oil | 46# |
Hydraulic power | 3kw | |
Cutting length | As required | |
No distorting or wasting. High level safety factor. | ||
Control Device | PLC control | PLC DELTA, TAIWAN |
PLC language | English and Chinese | |
Transducer | 7.5KW Delta, TAIWAN | |
Touch screen | 7 Inch large screen, DELTA, TAIWAN | |
Function | Automatic length and quantity measurement | |
coder | Omron, JAPAN | |
Other electrical device | International brand | |
Weight | About 5.5 tons | |
Dimension | About 8500*1500*1700mm L*W*H | |
Main body color | Yellow and blue | |
Voltage | 440v/60hz/3ph |
1. Engineer will give free training lessons to labors in buyer's factory.
2. The Buyer need buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for engineer.
3. During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by incorrect operations, we will provide the buyer spare parts at cost price.
4. We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
1) Q: Are you manufacturer or trading company?
A: We are manufacturer, we have 3 workshop for different kind of roll forming machine. The first one is for making color steel roll forming machine, second one is for making metal purlin roll forming machine, last one is for raw material processing.
2) Q: Do you provide installing and training overseas?
A: Overseas machine install and worker training services are optional. We can send engineer to buyer's factory to teach and install.
3) Q: How is your after sales support?
A: We provide technical support on line as well as overseas services by skillful technicians. What's more, we can provide updated spare parts to customer if they have requirement.
4) Q: How does your factory do regarding quality control?
A: There is no tolerance regarding quality control. Quality control complies with ISO9001.Every machine has to past testing running before it's packed for shipment.
5) How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference.
2) We welcome your visit us and test machine by yourself in our factory.
6) Q: Do you sell only standard machines?
A: Absolutely not. Most machines are customized according to buyer's specific demand.
7) Q: How can I contact you?
A: You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you.
8) Q: How to visit your factory?
A: 1) Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can pick up you.
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi, then we can pick up you.