hydraulic bucking unit is a machine designed for disassembly and assembly through 360° continuous rotation and is provided with high precision torque automated test system.
This machine is mainly used for disassembly and assembly of some cylinder threaded connection parts such as casing collar, tubing collar, oil well pump collar, tool joint, packer adapter, downhole tool and drilling tools in oil field.
In addition, it is also feasible to additionally install eccentric adjustment unit, disassemble and assemble eccentric workpiece.
Model: | YNJQ-400 | Power tong: | 360°full rotation |
Bore diameter: | ¢400mm | Pipe range: | 2-3/8"" to 15" |
Max.torque: | 100,000 lb-ft | Torque accuracy: | 200 lb-ft |
Speed range: | 0.5-5r/min | Motor power: | 30Kw |
Size: | 6mx2.0mx2.5m | Total weight: | 16t |
Manufacture : | Boyu machinery | Delivery time: | 45days |
Connections:
| API (round & BTC)and Premium connections(with or without shoulder) |
Scope of supply
Item | Configuration Name | Qty. | Unit | Remarks | |
1 | Bucking machine/ host machine | Power tong/ Headstock | 1 | set | |
Backup tong/ Tailstock | |||||
Base | |||||
2 | Console | Computer torque recorder, saving records, printing curve report | 1 | set | |
3 | Hydraulic Power System | Max.pressure:20MPa flow rate:40-240L/min | 1 | set |
SEACO Oilfield Equip,is manufacturer & stockist of equipments,services and solutions to the upstream to downstream in oil & gas industry.We are aimed at helping customers to obtain the maximum from their each well.Providing our customers superior quality at the best value for products and services in order to ensure our customers' continued satisfaction.
Our main range include but not limited below:
1).Rig packages: 250hp to 3000hp Land drilling rigs; Workover rigs(Fast-moving rigs are available).
2).Rig components: Crown block;Travelling block; Hook; Swivel; Rotary table; Drawwork; Driller's cabin; MCC/SCR house; MCC/VD house; Top drive ect...
3).Wellhead & Pressure control equipments: BOP; Chock & Kill manifold; Pressure hoses; BOP closing unit; Casing&Tubing head; X-Mas tree; Valves; Spools and flanges ect...
4).Solid control & Mud system equipments: Shale shaker; Desander; Desilter; Mud cleaner; Hopper; Centrifuge; Agitator; Mud tanks; Unions,ect...
5).Tubulars & Drilling strings: Drill pipe; HWDP; Drill collar; Kelly; Casing; Tubing; Pup joint; Sucker rod; Line pipes ect...
6).Tubular Running and handing tools: Elevator; Slip; Manual/Power tong; HPU; Bushing; Spinner; Bit breaker; Spider; Links; Stuibing guide; Thread protector ect...
7).Downhole/Fishing tools: Drilling & Fishing jar; Stabilizers; Hole opener; Overshot; Drilling bit ect...
8).Cement tools: Cement unit;Float collar; Float shoe;Liner hanger;Cement head ect...
9).Others: Air winch; Drilling line; Safety equipments; Mud pump spare parts; Rig parts; Fittings ect...
10). Commissioning and other services.
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |