Description
|
Cell | Mono |
Weight | 21.5kg |
Dimensions | 1722x 1134 x 30mm |
Cable Cross Section Size | TUV: 4mm2 (0.006inches2)/ 12AWG |
No. of Cells | 108 (6x18) |
Junction Box | IP68 |
Cable Length | Portrait 300mm/Landscape 1200mm/Customized |
Packaging Configuration | 36pcs/Pallet, 939pcs/40ft Container |
ELECTRICAL PARAMETERS AT STC |
Rated Maximum Power (Pmax) [W] | | 395 | | | | |
Maximum Power Voltage(Vmpp/V) | 30.6 | 30.8 | 31.0 | 31.2 | 31.5 | 31.6 |
Maximum Power Current(Impp/A) | 12.73 | 12.81 | 12.90 | 12.98 | 13.04 | 13.13 |
Open Circuit Voltage(Voc/V) | 36.9 | 37.0 | 37.1 | 37.2 | 37.3 | 37.5 |
Short Circuit Current(Isc/A) | 13.61 | 13.70 | 13.79 | 13.87 | 13.95 | 14.02 |
Module Efficiency [%] | 20.0% | 20.2% | 20.5% | 20.7% | 21.0% | 21.3% |
Power Tolerance | 0~+5W |
Temperature Coefficient of Isc [α_Isc] | +0.043%/°C |
Temperature Coefficient of Voc [β_Voc] | -0.26%/°C |
Temperature Coefficient of Pmax [γ_Pmp] | -0.36%/°C |
STC | Irradiance 1000W/m², cell temperature 25°C, AM1.5 |
Material
Production
NUUKO POWER CO.,LTD
With nearly 10 years of experience in the photovoltaic industry, our factory has an automated production workshop with 3GW production capacity. High quality products grade A with with competitive price. Also provide OEM service for clients, help to design Logo and other design service. NUUKO has created a "closed-loop" development model of solar module R&D and production, and distribution cooperation.
Company Profile
Project
Packing
Certifications
FAQ
Q: Do you have any experience manufacturing products for our industry?
A: We have more than 10 years experience in PV industry.
Q: Can you provide customization options for your products?
A: Yes, we provide OEM Service for you.
Q: What are the advantages of your company?
A: We have own factory, and we also cooperate with other Tier brands, aiming to provide customers with competitive prices and more choices.
Q: May I have a piece of sample to check the quality?
A: Welcome to place the testing order to check the quality or for testing.
Q: How about the delivery time?
A: About 15-20 working days after receiving your payment. (The specific delivery time depends on the items and the order quantity.)
Q: Where is the port of loading?
A: Shanghai or Ningbo port.