Support Customization Extra Long Blade Ejector Pin Sleeve for Mold Factory

Min.Order: 10
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 2 ~ 9.9

Description
Product Description

The ejector pin is a plastic mold accessory used in plastic molds. The ejector pin can also be called thimble, insert, middle needle, cradle, etc.

 
Detailed Photos
Product Name
Ejector pin straight ejector pins
Material Details
SKD11/SKD61/SKD51//ASP23/Vanadis/CPMRTXM4/HSS/A2,M2/D2/SUJ2/S45C
Standard
Dayton/Lane/DIN/ISO/MISUMI/EDM/FIBRO//HASCO
Size
Depend on your drawings or products standard
Surface Work
TiCN, TiN, Aitain, Ticrn, nitriding , Black oxygened, Black coating etc available
Customized
Available
Payment
T.T Western Union , Paypal
Production address
Dongguan, Guangdong, China
Delivery Time
Stocks Now(Or 7-8 Days)
Transport
DHL,Fedex,UPS,TNT or By Sea
Certifications

 

Strictly control the product quality and ensure that the products are 100% qualified.

 

Company Profile


Dongguan Jichun Mould Standard Parts Co., Ltd. was founded in 1997. 3 factories, 5 warehouses, 95 precision processing equipment, millions of product inventory. The factory is located in Dongguan, Guangdong Province, China. At present, it specializes in producing various stamping die parts, plastic die parts, automotive die parts, FA automation parts, various kinds of mechanical parts.



[Main Products] Guide Pins,Guide bush,Stripper Guide Pin,Stripper Guide bush,Holder Guide Post Sets,Ball Guide Post Sets For Die Sets,Plain Guide Post Sets For Die Sets,Guide Posts For Die Sets,Oil-Free Slide Plates,Punches & Dies,Punches,Punch Guide Bushings,Retainers,Coil Springs,Gas Springs
At the same time, we can manufacture according to the following criteria: Hasco / Misumi / DME / Pedrotti / Voest / Strack / Fibro / DIN / DAYTON / PUNCH / DANLY / Lmina.

FAQ

How to get a quote?  Send us the model or drawing you want.

How long is the delivery time?  Standard parts in stock and 7-12 working days.

How can you ensure the quality?  We have QC department to control the quality from the begining of production until goods finish.

What is your terms of payment?  Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us as below:

Danny Yang
 
 

 

Product Tag:
Related categories:
Scroll to Top