Best Selling Mini Cycle Counter E 24830 24V Cycle Counter

Min.Order: 10
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 1 ~ 3.6

Description
Plastic Mold Parts Cycle Counter Cumsa Cchs5328
Product Description

Cycle Counter
The counter for plastic molds is used to accumulate and record the times of mold trial and production. The 7-digit direct-reading display has high accuracy. The mold can be maintained in fixed numbers based on this data. The maximum operating temperature is 160°C. Mechanical type that cannot be reset. The counter can intuitively monitor the activity of the mold, obtain monitoring data from it, and provide a reference for mold repair and maintenance procedures.

Basic Information:
Brand Name
Jichun
Product Material
Nylon(including glass fiber)
Model Number
MRCC MRCCB CCVPL MCVR
Place of Origin
Guangdong, China
Shaping Mode
Plastic Injection Mould
Product Name
7 digital shot counter
  

 

 
 
Certifications
 

Strictly control the product quality and ensure that the products are 100% qualified.

 

Company Profile


 

 

[Main Products] Guide Pins,Guide bush,Stripper Guide Pin,Stripper Guide bush,Holder Guide Post Sets,Ball Guide Post Sets For Die Sets,Plain Guide Post Sets For Die Sets,Guide Posts For Die Sets,Oil-Free Slide Plates,Punches & Dies,Punches,Punch Guide Bushings,Retainers,Coil Springs,Gas Springs
At the same time, we can manufacture according to the following criteria: Hasco / Misumi / DME / Pedrotti / Voest / Strack / Fibro / DIN / DAYTON / PUNCH / DANLY / Lmina.

 

 

 

 

 

 

 


Dongguan Jichun Mould Standard Parts Co., Ltd. was founded in 1997. 3 factories, 5 warehouses, 95 precision processing equipment, millions of product inventory. The factory is located in Dongguan, Guangdong Province, China. At present, it specializes in producing various stamping die parts, plastic die parts, automotive die parts, FA automation parts, various kinds of mechanical parts.

FAQ

How to get a quote?  Send us the model or drawing you want.

How long is the delivery time?  Standard parts in stock and 7-12 working days.

How can you ensure the quality?  We have QC department to control the quality from the begining of production until goods finish.

What is your terms of payment?  Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

If you have another question, pls feel free to contact us as below:

Danny Yang
 
 
 

 
 
Product Tag:
Related categories:
Scroll to Top