China 5 Axis Dmg CNC Machining Milling Billet Aluminum Racing Motorcycle Engine Block Cover

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 90

Description

Company Profile

 

 

Workshop

Detailed Photos

Product Description

 

MaterialAlloy Steel, Copper alloy(brass,silicon bronze,phosphor bronze,aluminum bronze,beryllium copper),Stainless Steel,Aluminum,Titanium, Magnesium, Superalloys,Molybdenum, Invar,,Zinc,Tungsten steel,incoloy,Nickel 200,Hastelloy, Inconel,Monel,ABS, PEEK,PTFE,PVC,Acetal.
Surface TreatmentZn-plating, Ni-plating, Cr-plating, Tin-plating, copper-plating, the wreath oxygen resin spraying, the heat disposing, hot-dip galvanizing, black oxide coating, painting, powdering, color zinc-plated, blue black zinc-plated, rust preventive oil, titanium alloy galvanized, silver plating, plastic, electroplating, anodizing etc.
Producing EquipmentCNC machine,automatic lathe machine,CNC milling machine,lasering,tag grinding machine etc.
Drawing FormatPro/E, Auto CAD, Solid Works, UG, CAD/CAM, PDF
Managing Returned GoodsWith quality problem or deviation from drawings
WarrantyReplacement at all our cost for rejected products
Main MarketsNorth America, South America, Eastern Europe , West Europe , North Europe, South Europe, Asia
How to order* You send us drawing or sample
* We carry through project assessment
* We make the sample and send it to you after you confirmed our design
* You confirm the sample then place an order and pay us 30% deposit
* We start producing
* When the goods is done, you pay us the balance after you confirmed pictures or tracking numbers.
* Trade is done, thank you!!

 

Quality Control

Packaging & Shipping

Customer Reviews

FAQ


Q1:What kind of information do you need for quotation?
A: You can provide 2D/3D drawing or send your sample to our factory, then we can make according to your sample.

Q2: Can we sign NDA?
A: Sure. We can sign the NDA before got your drawings.

Q3: Do you provide sample?
A: Yes, we can provide you sample before mass order.

Q4: How can you ensure the quality?
A: We have profesional QC,IQC, OQC to guarantee the quality.

Q5: Delivery time?
A: For samples genearlly need 25 days. Mass production: around 30~45 days after receipt of deposit (Accurate delivery time
depends on specific items and quantities)

Q6: How about the transportation?
A: You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.

Product Tag:
Related categories:
Scroll to Top