Product Description
RFID Chip + RFID Antenna + Housing Material(PVC/PET/Paper etc)
Antenna Size: | 95x3mm |
Wet Inlay/Label Size: | 125x7mm(customized) |
Label Material: | Coated Paper/PET/Fragile Paper |
Working Temp: | -40~+85ºC |
Storage Temp: | -40~+85ºC |
RFID Features: |
|
RFID Standard: | ISO/IEC 18000-6C (EPC Gen2) |
Chip Type: | Impinj Monza 4E/ 4QT |
EPC Memory: | 496 bits/128 bit |
User Memory: | 128bits/512 bits |
Read Range(2W ERP): | 4.5m |
Other Features: |
|
Data Storage: | > 10 years |
Re-write: | 100,000 times |
Customization: | Printing LOGO, Barcode, Serial number, Encoding, Designing,etc |
Application: | Library management Logistics management Document management Assets management, etc. |
IDtrack tech has many years experience in producing RFID card and tags. We sell to many countries in the world. We have the most advanced production equiptment and the most professional workers. Quality is the most important title in our facory. We always supply customer the most stable quality with the best price.
Question 1: How to place an order?
A: The procedure is like this:
1). Contact customer service to determine the specification and product model, quantity and other detailed information (you can also arrange freight forwarding by yourself);
2). We provide you with a proforma invoice according to your final decision, which contains all product details;
3). You need to arrange 30% of the payment to our bank account, and then we will prepare the product to start production (the cycle is generally about 10 days, which can be shipped specifically for your order configuration quantity);
4). After the product is completed, the remaining payment is paid, and we arrange forwarder delivery (or we provide relevant information to arrange forwarder transportation by ourselves).
5). After completing this process, the customer service will track the product location and notify you when it is about to arrive and when it arrives, so that you can quickly prepare for customs clearance and other related issues.
6). After getting the items, there will be a dedicated after-sales team waiting for your follow-up feedback.
Q2. What is your production/delivery time?
A: The production/delivery time will be controlled within 20 days (generally, it can be shipped in 10 days and simple configuration is 2-3 days).
Q3. Do you test all items before shipping?
A: Yes, we have passed 100% testing before shipment (basic equipment testing also includes roads, climbing, raining, over-water roads, etc.).
Q4. Do you support sample shipment?
A: Yes, we support shipping samples to the port
Why choose us?
1. Complete certificate
2. Perform 100% QC inspection before leaving the factory
3.100% tracking the progress of product orders and feedback
4. Real-time tracking of customers to ensure that orders are produced in strict accordance with customer plans
5. Complete development and supply chain to provide follow-up quality assurance.