surface treatment: | mirror polish,satin polish, Electrolytic polishing,Vibration grinding,pickling,Shot blasting and sand blasting |
Machining facility: | CNC lathe, cnc milling, stamping machine, automatic lathe, linear cutting machine,polishing machine, thread rolling machine, tapping,drilling machine, bending machine, etc. |
Measuring & testing equipment: | CMM, Projector, Hardness testing, Roughness tester, Hardness tester, Height tester,Salt Spray Test Machine,etc. |
Our advantage:
Our company
CUSTOM STAINLESS STEEL FABRICATION & SPECIALTY MACHINING CAPABILITIES | ||||
History | Founded in 1999 | |||
Certificate | ISO9001:2015 | |||
General Capabilities | Small Components | Inventory | ||
Large Components | Packaging | |||
Consulting | ||||
Fabrication Method | Bending | Laser Cutting | ||
CNC Machining | Rolling | |||
Cutting | Welding | |||
Flanging | ||||
Materials | 304L | Hastelloy | ||
316L | Monel | |||
317L | AL6XN | |||
Titanium | ||||
Raw Material Forms | Sheet | Round Bar | ||
Plate | Pipe and Tube | |||
Material Thickness | Min- 18 gauge (0.049") | |||
Tolerance (+/-) | ±0.002" | |||
Fabricated Products | Adapters | Instrument Tee Body | ||
Back-Up Flanges | Pad Flange | |||
Cone Reducer | Plate Flange | |||
Cross | Return Bends | |||
Flanged End Fittings | Spectacle Blinds | |||
Grooved Fittings | Tangent Reducer | |||
45 Lateral | Tee | |||
45 Lateral Tee | True Wye | |||
Elbows Smooth Flow | Wear Pads | |||
Elbows Mitered | ||||
Additional Services Provided | Polishing | |||
Glass Bead Blasting | ||||
Water Jetting | ||||
Production Volume | Specialty Production Shop | |||
Low to Medium Volume | ||||
Typical Lead Times | 3 to 15 Days for Custom | |||
Same day if Inventory | ||||
Rush Services Available |
Product display
1) Checking the raw material after they reach our factory------- Incoming quality control (IQC)
2) Checking the details before the production line operated
3) Have a full inspection and routing inspection during mass production---In-process quality control (IPQC)
4) Checking the goods after they are finished---- Final quality control (FQC)
5) Checking the goods after they are finished-----Outgoing quality control (OQC)