Aomatic High Speed 2 Layer HDPE Film Blowing Machine Plastic

Min.Order: 1
Product origin: Nantong, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 15000 ~ 40000

Description
Product Description

1. Bubble roller: double layer bubble roller, inner layer through cooling water, outer hollow part through negative pressure to produce bubbles. The foam roller is independently produced by Jianda, with a maximum service life of more than 7 years.
2. Die head: the material is German die steel A1.2133, also independently produced by Jianda.
3. Gear box: Guomao or KAIbo brand hard gear box, reliable quality, so there is no need to change frequently, or overhaul the equipment, reduce the user's daily maintenance cost.
4. Screw: better plasticizing effect, better adaptability to formula and recycled material.

Detailed Photos

Packaging & Shipping

Packaging
Stable wooden package protects machine from strike and damage.

Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.

Shipping

For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.

FAQ

1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.

2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc

3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc

4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.

5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.

Product Tag:
Related categories:
Scroll to Top