Fosite Wholesale/Supplier Green Color PPR Pipe Fittings Plastic Union Water Ball Valve

Min.Order: 5,000
Product origin: Shijiazhuang, Hebei, China
Infringement complaint: complaintComplaint
US$ 0.12 ~ 0.18

Description
Attribute advantage.



STEP1
Ensure that the ends pipe is well defined and without scraps. the thead with use of a thread sealant will give a pressure tight seal.
STEP2
The connection pips must be placed on the same axis and should be psitioned straight.These must be carefully aligned and the conrrect distance .
STEP3
The pipes must be sustained as to avoid bending,length of the thread must be followed with table 1.
STEP4
The spanner or wrench should be paced on the right positions before assembly,with pipe secure,rotate valve,grip on flats next to joint being made.
STEP5
Assemble pipe into valve to hand tight then tighten by the spanner or wrench,see the following recommendation installation torque

      With 15+ years production experience . piping system is widely favored at home and abroad by its' high quality and good price .
1. Full size:20-160mm
2. Accept customization: line, typing, color, packaging, length
3. Different water pressure: PN12.5 PN16 PN20 PN25
4. Best materials: 100% brand new Korea Hyosung Material/Borealis PPR
5.50 years guarantee
6. water temperature 95ºC.
7.Non-toxic, harmless, no rust, no corrosion
8. Large production capacity: 10 production lines, each can produce 18,000 meters pipes/day


Do

       Store pipe on firm and flat surfaces. Keep pipe and fttings away from sharp objects, heat,and toxic and aggressive materials. Take carenot tocut,kink,abrade,or otherwise damage the pipe during handling. Keep protective packaging intact until pipes and fittings are required for use. Release coils carefully,keeping in mind they may be coiled under tension.
Take care when handling pipe under wet or frosty conditions,as the pipe may become slippery. Temporarily cap cut pipe ends to prevent dirt or other material from entering the pipe.
Uncoil pipe and allow it to warm in the sun before burial for ease of installation.

DON"T

      Throw pipe from delivery vehicles.· Drag pipe or roll pipe coils. Place pipeand fittings incontact withlubricating oil,gasoline,solvents,or other aggressive materials.Heat pipe with an open flame.
 
Factory real shot

 

 

Certifications

 

Application
 
PPR PIPE APPICATION

a) Hot and cold portable water pipelines;
b) Central heating system;
c) Floor, wall and radiant heating systems;
d) Industrial piping system for transferring or discharging chemical media

 
 
Related Products
 

 

FAQ

FAQ
Q1: Are you manufacture?
A: YES we are manufacturer.
 
Q2: Do you provide free sample?
A: YES, we supply you free sample within one day.
 
Q3: What is your deivery time?
A: Our delivery time is normally 7 to 15 days after deposit.
 
Q4: What is the payment terms?
A: We accept T/T, L/C at sight, PayPal & West union.
 

Q5: May I visit your factory?
A: Yes we welcome your visiting us someday at your convenience.
 

Q6: Can you accept our deisgn and products?
A: Yes we have professional engineer teams. We can deisgn and produce special products
Q7: where is your factory ?
A: Our factory is located in Shijiazhuang City, Hebei Province


 
Product Tag:
Related categories:
Scroll to Top