Layher frame/ modular frame scaffolding, mainly for facade masonry construction work. It is popular in European market.
It has several modular parts, including the main frames which have two standard width 1.09m and 0.73m. People can walk through it.
Different standard heigth include: 0.66m, 1.0m, 1.5m, 2.0m.the width 0.66 and 1.09m
Its modular design which insures a very convenient handling during erection of the scaffolding system.
Item | Specification | Weight(kg) | Material | Finish |
Door frame 48.3*3mm | 1.09MX0.66M | 14.62 | Q345 | HDG |
1.09MX1.0M | 18.2 | |||
1.09MX1.5M | 21.9 | |||
1.09MX2.0M | 24.8 | |||
0.73MX0.66M | 9.6 | |||
0.73MX1.0M | 13.5 | |||
0.73MX1.5M | 16.2 | |||
0.73MX2.0M | 21 | |||
Ledger 33.5*2mm | 1.09M | 2.1 | Q235 | HDG |
1.57M | 3.3 | |||
2.07M | 4.4 | |||
2.57M | 5.6 | |||
3.07M | 6.2 | |||
Brace 42.4*2mm | 1.57M | 5.5 | Q235 | HDG |
2.07M | 7 | |||
2.57M | 7.8 | |||
3.07M | 8.8 | |||
Middle frame 48.3*3mm | 1.09M | 8.82 | Q345 | HDG |
0.73M | 8.15 | |||
Top/Botom frame 48.3*3mm | 0.73M | 14.64 | Q345/Q235 | HDG |
1.09M | 16.8 | |||
DoubleHandrail 42.4*2/ 27*2.5mm | 0.73M | 4.6 | Q235 | HDG |
1.09M | 5.6 | |||
Handrail | 1.57M | 4.97 | Q235 | HDG |
2.07M | 6.63 | |||
2.57M | 8.44 | |||
3.07M' | 9.34 | |||
Tripod | 0.36M | 3.98 | Q235 | HDG |
0.73M | 6.8 | |||
Aluminum platform with ladder | 3070*610mm | 28 | Aluminum/ Polywood | Self finish |
2.57*610mm | 25.1 | |||
2.07*610mm | 22.5 |
Rizhao Weiye Tools Co.,Ltd. is a leading manufacturer of system scaffoldings and accessories, forged couplers, plank, shoring props, formwork accessories, fences, ladders, frame scaffolding and other related products in Rizhao City, Shandong, China.
We have been in the business for 25 years, and all our products are BS 1139 and EN 74, AS 1576 certified, the quality is very good. Our products are very popular in European countries, Australia, North America, Mid-east countries, and South East Asia and some African countries, etc.
Currently, we have well-trained workers of more than 300, advanced forging lines of 10 and many other advanced equipment. We are also capable of tooling designing, performance testing, new products researching and developing. We have two factories taking up to 160000 square meters. With years of development, we can reach a production capacity of more than 20 containers per month. We are growing all the time.
We have our own zinc plating and powder coating workshops and cast steel/cast iron part processing workshop, which enable fastest delivery and most consistent quality of the products.
We are looking forward to establishing long term business relationship with you in the near future!
1. We have our test lab to do the basic test for scaffolding couplers, base jacks, planks and some scaffolding parts.
2. We have our own workshop to make new moulds and develop new moulds
3. We have 3 engineers who do the products designing, developing and mould designing works.
4. We have 10 automatic production lines, including automatic welding, automatic production of the steel planks, CNC machine.
5. We have more than 20 professional employees who do the inspection work for each procedure of the productions.
6. We have 3 professional personnel who are in charge of the package and delivery.
Q 1, Are you a factory or a trading company?
We are a factory
Q2. Where is your factory located? How can I visit it?
It is located in Gaoxing Town, Rizhao City, Shandong Province, China. You can fly to Qingdao Airport or other airport and then fly to Rizhao Airport or take the bullet train to Rizhao Railway Station.
Q 3. Can I get some samples?
Yes, free sample are available upon request.
Q 4. What is your production capacity?
15 containers/month.
Q 5. Do you have Certificate?
Yes, industry standard certificate.
Q 6. Do you have your own test lab?
Yes, we have our own test lab, and we can conduct all the basic tests.
Q 7. Payment term?
T/T, L/C at sight, etc.