Model | R1050 |
Temperature control(ºC) | RT~99 |
Control screen | LCD |
Heating power(W) | 6000 |
Power(W) | 6300 |
Pressure rate | ≤2kPa/h |
Maximum vacuum(Pa) | 399.9(≤3mmHg) |
Rotary motor power(W) | 250W brushless motor |
Host speed | Digital DC stepless speed regulation |
Motor rotating control(rpm) | 0~120 |
Condenser | Vertical, main cold + sub cold, high efficiency three-return condenser |
Condensation area(m2) | Main cold:1.04 |
Deputy cold:0.22 | |
Rotary flask | 50L,Flangetype Ø125mm |
Collection flask(L) | 20 |
Bath material | Stainless steel, SUS304 material |
Bath size(mm) | Ø550mm×320mm |
Temperature accuracy(ºC) | ±1.5 |
Lifting mode | Electric lifting |
Lifting distance | 0~180 |
Lifting speed | 10mm/s |
Bath power(W) | 4000 |
Vacuum seal | Teflon + Teflon fluorinated rubber double seal |
Discharge valve (spool) | PTFE |
Evaporation speed(L/h) | Water:9 |
Ethanol:24.5 | |
Protection | Over current protection, ground fault protection, over temperature protection and dry burning protection |
Optimum ambient temperature(ºC) | 5~35 |
Ambient relative humidity(%) | ≤65 |
Power | Three phase 220V/380V,50Hz/60Hz |
Product size(mm) | 1320W×710D×2340H |
Product weight(kg) | 115 |
Packing size(mm) | 1350W×660D×1380H |
Gross weight(kg) | 180 |
FAQ:
Q1. What is your products range?
• Industry water chiller, recirculating cooling chiller, rotary evaporator, alcohol recovery equipment, short path distillation kit, glass molecular distillation equipment, falling film evaporator, jacketed glass reactor and other lab equipment.
• Know more
Q2. Are you trading company or manufacturer?
• We are professional manufacture of lab equipment and we have our own factory.
Q3. Do you provide samples? Is it free?
• Yes, we could offer the sample. Considering the high value of our products, the sample is not free, but we will give you our best price including shipping cost.
Q4. Do you have warranty?
• Yes, we offer 1 year warranty for the spare part.
Q5. How long is your delivery time?
• Generally it is within 7 working days after receiving the payment if the goods are in stock. Or it is 15 working days if the goods are not in stock, depending on order quantity.
Q6. What is your terms of payment?
• Payment≤15,000USD, 100% in advance. Payment≥15,000USD, 70% T/T in advance, balance before shipment.