Various Size Silicone Hole Stopper, Rubber Pipe Plug for Dust Proof with Food Gradeq

Min.Order: 1,000
Product origin: Quanzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 0.1

Description



 
 
 
 

 
 
Material
rubber
Service
OEM or ODM
Production basis
Samples or drawings
MOQ
100 pcs Silicone plug
Sample
Sample is free from stock
Performance
1. Good sealing effect
2. Good flexibility
2. Oil and water resistance
3. Corrosion and aging resistance
 
Packaging & Shipping
All washer seals will be well packed before shipping.  they will be shipped by sea, by air or by express delivery according to the weight, the quantity or as the customers' requirements.
 
Delivery Time
  2-7 days for samples
 3-15 days for mass production

 
 
 Our Company
 We are a manufacture mainly specialize in producing different types of Silicone plug, gasket, customized rubber products.The materials are available in  SILICONE, VITON, EPDM, NBR, HNBR, SBR, CR and so on.We have thousands of available O-ring moulds in stock and sample is free from our stock. We can also open new moulds as customers' drawings or physical sample for standard or non-standard O rings and other rubber parts.

 
 
 
 



 
Certification
 
 
 
 

 
Our service
 1.More than 10 years experience in manufacturing Silicone plug
 2. 2-7 days fast sample delivery time.

 3. We have our own import & export license, OEM&ODM service are available.

 4. ISO9001,ISO14001 and RoHS certificate are available.

 5. We accept sample order, trial order and mix order.

 

FAQ
1. What is your MOQ ?
Usually our MOQ is 1000 pcs. But we accept small quantity for the first trial order.
 
2. Can I get sample ?
Sure. We usually provide existing sample for free. But a little sample charge for custom designs. Sample charge is refundable when order is up to certain quantity.
 
3.How long is the sample LEAD TIME?
For existing samples, it takes about 2 days. They are free. If you want your own designs, it takes 3-7 days, subject to your designs whether they need new printing screen, etc.
 
4. How long is the production lead time?
It takes about 15 days for MOQ.
 
5. How much is the freight charge?
,,.,.6. ,?.JPG,AI,CDRPDF..
 



 
Product Tag:
Related categories:
Scroll to Top