Carbon Steel Elbow ASTM B 16.9 Squared Beveled Ends Degree 60 Elbow

Min.Order: 1
Product origin: Haikou, Hainan, China
Infringement complaint: complaintComplaint
US$ 1

Description
Product Description

1. Elbow(45deg, 90deg and 180deg/LR and SR)

2. Size: 1/2"-36" can be seamless, 5"-110" can be welded
3. Thickness: Sch20, Std, xs, xxs, sch10, sch20, sch30, sch40, sch60, sch80, sch160, etc.
4. Carbon steel: A234 wpb, st37.2, st35.8, API 5L GR B, API 5L X42, API 5L X52, API 5L X60, API 5L X65, API 5L X70 and so on.
5. Surface:
Black painting or color painting for carbon steel and alloy steel fittings
6. 8" and bellow size will packed by plywood case.
  10" and above size will packed by plywood pallet
7. Standard: ANSI B16.9, MSS SP 75, EN10253-2, JIS B2313
8. Our main clients are from Turkey, Italy, France, Spain, South Africa, Moroco, Dubai, Iran, Syria, Singapore, Vietnam, Austria, USA, Canada, Mexico, Korea, Thailand, India, Bulgaria, Russia and so on
9. Usage: Petroleum industry, Refinery Company, fertilizer industry, power station, shipbuilding, onshore platform

Name
elbow(90deg/45deg/180degLR/SR)
TypeBUTT WELDED PIPE FITTINGS
FORGED PIPE FITTINGS (SW/Thread)
Size1/2"-36" seamless, 8"-110" welded
Wall thicknessSTD, XS, XXS, SCH10,SCH20,SCH30,SCH40, SCH60, SCH80, SCH160
2000#,3000#, 6000#, 9000# 
Applicable
 standard
ASME, ASTM, MSS, JIS, DIN, EN,



Material
Stainless steel: A403 WP304, A403 WP304L,A403 WP316, A403 WP316L, A403 WP321
Carbon steel: A234WPB, A420 WPL6
Alloy steel: WP11, WP22, WP12, WP5, WP9, WP91
Stainless steel: A182 F304, A182F304L,A182 F316, A182 F316L, A182 F321, A182 317H, A182316Ti, F53,F51 
Carbon steel: A105, A350LF2
Alloy steel: A182 F11, A182F22, A182F12,A182 F5, A182F91, A182 F9
Delivery TimeUsually Within 30 days after the order date or as your requirement
PaymentL/C at sight, T/T
Application rangsuch as oil, chemical industry, water conservancy, electric power, boiler, machinery,metallurgy, sanitary construction etc
PackagingWooden cases, wooden pallet plastic bag or as per customers requirement 
Others The belief we are following is " Marketing our living by quality and developing our career by credit standing"
Product Process

 


Quality testing: site direct reading, Desktop metallographic, Bending test, High temperature tensile test, Impact test etc.
Certifications

Detailed Photos



Customer Visit


Packaging & Shipping

 

FAQ

1. Are you a factory or trading company?
A: We are a factory.

2. How can I get a quotation from you ?
A: You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.
And you can also find our contact information on contact page.

3.Can I get samples before order ?
A: Yes, of course. we can produce by your samples or technical drawings. 

4. what is your delivery time ?
A: The time of delivery is usually around 20 days(1*20FT as usual).
We can send out in 2 days, if it has stock.

5.What is your payment terms?
A: A: Our usual payment term is 30% deposite before production, 70% balance before shipment. L/C is also acceptatble.EXW,FOB,CFR,CIF.

6.How does your factory do regarding quality control?
A: Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.
And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,
we will make the last test to pick up the unqualified products

7.What is your MOQ?
A: As long as hold one container ,we can accpet the order.

Scroll to Top