Principle of work
The integrated sewage treatment equipment elimination organic matter pollutant and the ammonia nitrogen mainly according to depend in equipment,s AO biological treatment craft.And the principle od work is in a level,because the sewage organic matter density is very high,the microorganism is at the anoxic condition,the time the microorganism is the optional microorganiam,they decompose the sewage in organic nitrogen transformation NH3-N,simultaneously uses the organic carbon to take the electron donor,NO2-N,NH3-N transforms N2,moreover also synthesizes the new cellular substance using the part organic carbon carbon source and NH3-N,therefore a level pond not only has certain matter elimination function,reduces the following good oxygen pond the organic load,favors the nitrification advance,moreover according to the high density organic matter which exists depending on the raw water,completes the denitrification,disappears finally the denitrogenation eutrophication pollution.In O levels,because the organic matter density reduced large scale,but still had the ration organic matter and the high NH3-N existence,to enable the organic matter to obtain further oxygenolysis,simultaneously in the carbonification is in completes in the situation the nitrification to be able to carry on smoothly,in o level of establishment organic load low good oxygen biology contact oxidation pond,mainly has the good oxygen microorganism and form the oxygen bacterium in o level of ponds(nitrifying bacteria ).And the good oxygen microorganism decomposes the organic matter CO2 and H2O;From the oxygen bacterium(nitrifying bacteria)produces using the organic matter decomposition in the inorganic carbon or air CO2 takes the nutrition source,transforms the NO2-N,NO3-N,o level pond sewage in NH3-N the water leakage partial refluxes to a level pond,is a level pond provides the electron acceptot.Disappears finally through the denitrification the denitrogenation pollution.
Performance features:
Model | QDCK1 | QDCK2 | QDCK3 | QDCK5 | QDCK7 | QDCK10 | QDCK15 | QDCK20 | QDCK25 | QDCK30 | QDCK40 | QDCK50 | |
(m3/h )Process load | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 | |
()Number of articles | 1 | 1 | 1 | 1 | 2 | 3 | 3 | 4 | 4 | 4 | 5 | 5 | |
Air blower | (m3/min)Amount of wind | 0.31 | 0.59 | 0.67 | 1.02 | 1.72 | 2.5 | 4.11 | 4.11 | 2.5×2 | 4.11×2 | 4.11×2 | 4.11×3 |
(m.Mh2o)Wind pressure | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | 5000 | |
(KW)Power | 0.55 | 0.75 | 1.5 | .5 | 2.2 | 3.7 | 5.5 | 5.5 | 3.7×2 | 5.5×2 | 5.5×2 | 5.5×3 | |
Water pump | (m3/h)Current capacity) | 1 | 2 | 3 | 5 | 7 | 10 | 15 | 20 | 25 | 30 | 40 | 50 |
(m)Lifting | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |
(KW)Power | 0.55 | 0.55 | 0.55 | 0.75 | 0.75 | 0.75 | 0.75 | 1.5 | 1.5 | 2.2 | 3.7 | 5.5 | |
(m2)Area | 6 | 10 | 14 | 19 | 28 | 39 | 58 | 75 | 93 | 113 | 143 | 168 |
1,Thirteen years experience in wase treatment facilitis.
2 , Cooperating customers all over the word.
3, The pursuit of company.
We based on "technological development, pollution remediation, wholeheartedly for customer services". We hope to cooperate withall customers from all over the world and build a better world together.
1.24-hour a day, 365-day a year access to a toll-free health care professional hotline for questions and trouble-shooting assistance freely.
2.all year round on site installation and debugging service abroad with professional engineer guide and training.
3. professional guide installation and operation
4. Manual book in English will accompany with the machine to arrive your destination.
5. Technical drawing, layout .