Description
For the SPS parking system, the parking space selected is moved to the derised position by means of an automatic control system, and the parking space can be shifted vertically or horizontally. By swiping card or input code, the system automatically moves the platforms in the desied position.Model | PSH20/25 Series |
Levels | 2-15 levels |
Available Vehicle Size | 5000mm x 1850mm x 1550mm (LxWxH) *can be customized to fit for SUV |
Drive mode | Hydraulic Cylinder + Steel Cable |
Lifting capacity | 2000kg *can be customized to fit for SUV |
Sort | Anna Shi |
Control | Omron PLC system |
Operation | Button, IC cards, or manual, with LED display |
Finishing | Sand blasting, Zinc spray, then Surface painting for protection |
Mechanical:All steel materials are national standard steels, sourced from top steel factories in China.
All the essential parts are adopted stronger and thicker materials to make sure the
structure is always stable.
Akzo Nobel powder is applied on the structure surface
Modular structure can reduce the failure rate of systems effectively. This featur e also
makes the installation, commission and maintenance eas ier and more convenient.
2 Waving plates:
Made of galvanized plates with 90-120μm galvanization finishing, which performs very well for different outdoor environments.
The shape of every waving plate is specially fabricated for antislip.
3 Wire ropes:
7 times load of rated capacity ensures safety
4 Sheaves:
All the sheaves we are using are made of high quality extra strong MC Nylon with oil retaining bearing. They are wearing resistant and 4 times as long as the lifetime of steel cast sheaves. They can be self lubricated to protect wire ropes with much less wearing, low noise and low vibration.
5 Screw bolts & nuts:
All galvanized
48 hours salt spray test
Electrical:
The control system is Omron PLC. Emergency stop button, air switches
Hydraulic:
Power pack:
Motor:
Sourced from biggest motor supplier in China Korean or SIEMENS motor is optional
Valves: Pressure relief valve: overload protection
Throttle valve: descending speed is adjustable
Cylinder: Italian Aston seals inside
Fast and smooth motion
Oil tube: Instead of welded steel tube, the new seamless cold drawn oil tubes are adopted to avoid any block inside of tube due to welding.
Function:
SUVs can be accommodated
The structure can be larger and higher with 2500kg capacity on each platform to fit for SUV parking.
Customized dimensions:
The system can be expanded to a combination of 3 levels underground and 2 to 15 levels above ground.
The usable sizes of each platform, length, width and height, can be customized according to car sizes in different project.
Safety gate in front of the system is optional. Both lifting gate and sliding gate is available for customers' choice.
FAQ: Q1: You are a factory or a trader?
A: We are manufacturer, we have our own factory and engineer.
Q2. What are your terms of payment?
A: T/T 50% as deposit, and 50% before delivery.
We'll show you the photos of the products and packages before you pay the balance.
Q3. What are your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 40 days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6: How can I get more discount?
A:contact me by inquiry button, I will offer you big surprise!