The Filter Cartridge Dust Removal Equipment/Dust Collector for Sale

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 5000 ~ 6000

Description
The Filter Cartridge Dust removal equipment/dust collector for sale

The Main Feature:

1. The dust air inlet shall be equipped with dust plate to prevent the dust from directly impacting the filter cylinder, thus extending the service life of the filter cartridge.

2. Compact structure and small footprint.

3. The filter cylinder is inclined and drawer installed, which can make the cartridge to be removed and replaced more conveniently.

4. For the general dust, the filter cartridge can be used for a long time without replacement, which saves the tedious work of the commonly used bag filter, and saves a lot of maintenance costs.

5. The filter cartridge is a modular combination, and its size is optional.The original combination can be expanded to increase the dust removal unit without much modification to the original equipment.




Technical Parameters:
PARAMETERRemoving dust air volumeFiltration(M2)Induced draft fan rate(kw)
HR-43000805.5
HR-860001207.5
HR-12900018011
HR-161200024022
HR-241800036022
HR-322400048030
HR-362700054037
HR-403000060037
HR-483800072037
HR-564200084045
HR-645600086045



Company Information:
Qingdao Puhua company focus on design, research, develop, manufacture and sell sand blast booth, sand processing equipment, painting line,environmental protection equipment, all kinds of shot blasting machine, , includes hook type, crawler belt type, roller type, catenary type, road surface type etc. Products all adopt auto CAD, supplying the best cost performance products for casting, metallurgy, automobile, shipbuilding, construction, mining machinery and engineering machinery. They also can base on users' requirements to design and manufacture various non-standard special casting machinery, provide the designing - manufacturing - debugging - training - services for the integration of turnkey projects.

Contact Information:

FAQ:

1. Production time:

20-40 days according to different type.

2. Installation and commissioning time:

10-15 days.

3. Installation and commissioning issue:

We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.
4. Warranty time:

12 months from date of commissioning completion.
5. Payment term:

30% as prepayment, balance 70% before delivery or L/C at sight.
6. We supply full english documents:

including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.

Product Tag:
Related categories:
Scroll to Top