Hot DIP Galvanized 3m-12m Street Light Pole

Min.Order: 1
Product origin: Yangzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 100 ~ 250

Description

Our light poles are made from quality sheets through bending, forming, automatic welding, hot dip galvanization and powder coating. We owned advanced production-line, it included Flatting machine, Steel plate shearer, bending machine, Auto-closed up machine, submerged arc welding machine and powder coating line. Both of our craft and technique are satisfactory.

Street Light Pole: 


Technical Date:

MatrialUsually Q235/A36, minimum yield strength ≥ 235n/mm²
As well as hot rolled coil from Q460 , ASTM573 GR65, GR50 ,SS400, SS490ST52
Mounting Height3M-35M
Shape Of  PoleRound conical; Octagonal conical; Straight square; Tubular stepped; Polygonal
Thickness3mm-10mm
BracketsSingle or double brackets are in the shape and dimension
Base Plate MountedSquare or round in shape with slotted holes for anchor bolt and dimension
Ground MountedThe length buried underground
Surface TreatmentHot-Dip galvanized following ASTM A123
Color polyester power or any other standard by client required.
UsageHighway/Roadway/Residential subdivisions/Commercial development
CertificateISO9001,CE,CCC,RoHS,SGS,Soncap, SASO.
Customized/Design ServiceOffered


Production Process :

3M-12M Light Pole Specification

Light Pole HeightTop DiameterBottom DiameterPole ThicknessBase Plate
3M60MM130MM2.75MM250*250*S14MM
4M60MM130MM2.75MM260*260*S14MM
5M60MM140MM3.00MM260*260*S14MM
6M60MM145MM3.00MM300*300*S16MM
7M76MM160MM3.00MM300*300*S16MM
8M80MM180MM3.25-4.00MM320*320*S20MM
9M80MM180MM3.25-4.00MM350*350*S20MM
10M90MM200MM3.5-4.00MM400*400*S20MM
11M100MM205MM3.75-4.00MM400*400*S20MM
12M100MM220MM4.00-5.00MM400*400*S20MM

Payment & Delivery
Payment TermsT/T(perfered)
 
EXW30% In Advance, 70% Balance Paid Before Delivery
FOB
CFR/C&F30% In Advance, 70% Against Copy Of  B/L
CIF
L/CTotal Amount Above USD100,000, We Accept L/C At Sight
West UnionTotal Amount Less Than USD1,000
PayPal
Delivery Time15-20 Working Days After Receiving Down Payment For One Container.


Product Tag:
Related categories:
Scroll to Top