Product number | KY-DC-45KW | KY-DC-60KW | KY-DC-80KW | |
Detailed specification | rated power | 45KW | 60KW | 80KW |
Charging equipment | User Interface | 7 inch LCD color display touch screen | ||
installation | Floor-standing/Down in down out | |||
Routing mode device size | 635*423*1600(mm) | |||
Input voltage | AC380V±20% | |||
Input frequency | 45~65Hz | |||
The output voltage | 200-750VDC | |||
Single gun output current range | 200V-500V | 200V-500V | 200V-500V | |
The output voltage | 0-90A | 0-120A | 0-160A | |
Single gun output current range | 200V-750V | 200V-750V | 200V-750V | |
The output voltage | 0-60A | 0-80A | 0-107A | |
Charging equipment | Single gun output current range | 0-112A | 0-150A | / |
Cable length | 5m | |||
Electrical index | Measurement accuracy | Level 0.5 | ||
Current limit protection value | ≥110% | |||
Voltage regulation accuracy | ≤±0.5% | |||
Steady flow accuracy | ≤±1% | |||
Ripple coefficient | ≤±0.5% | |||
effectiveness | ≥94.5% | |||
Power factor | ≥0.99 (50% load or more) | |||
Harmonic content THD | ≤5% (50% load or more) | |||
feature design | HMI | 7 inch LCD color display touch screen, LED indicator | ||
Charging mode | Auto full / fixed power / fixed amount / fixed time | |||
payment method | Credit card payment / APP payment / scan code payment | |||
Communication Interface | Ethernet 2/3/4G (optional) | |||
Safety design | Executive standard | GB\T 20234, GB/T 18487, GB/T 27930, NB\T 33008 | ||
security function | Charge gun temperature detection, overvoltage protection, undervoltage protection, overload protection, short circuit protection, grounding protection, over temperature protection, low temperature protection, insulation monitoring protection, polarity reverse connection protection, lightning protection, emergency stop protection, leakage protection | |||
Environmental indicators | Operating temperature | -25°C~+50°C | ||
Working humidity | 5%~95% non-condensing cream | |||
Working elevation | <3000m | |||
Protection level | IP54 | |||
cooling method | Forced air cooling | |||
Noise control | ≤60dB | |||
MTBF | 100,000 hours |
What is your terms of payment? |
A: Alibaba online fast payment, T/T |
Do you test all your chargers before shipping? |
A: All major components are tested before assembly and each charger is fully tested before shipped |
Can I order some samples? How long? |
A: Yes, and usually 7-10 days to production and 7-10 days to express. |
How long to fully charge a car? |
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours. |
Are you Trading Company or manufacturer? |
A: We are professional EV charger manufacturer. |