Steel Pipe Roller Conveyor Shot Blasting Machine for Different Material Steel Pipes

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 20000 ~ 30000

Description
Conveyor roller shot blasting machine with CE ISO certificate

Q69 series Roller conveyor through-type shot blasting machine is the type of horizontal shot blasting

machine for steel, sheet metal, structural, pipe, bar blast cleaning.
Roller conveyor through-type shot blasting machine runs through the motor roller conveyor of the

cleaning room of for the workpiece,the workpiece gets multi-angle ejection cleaning when forwarding.

It adopts continuous through way operation.

The roller conveyor through-type shot blasting machine composed the production line with the pre-

heating,drying and other processes.

Widely used in the ship, automobile, rolling stock, bridge, steel structure, machinery and other

industries for steel, profiles and structural parts of the pretreatment process;

processing plate thickness 1.5-100mm,

width 1000-4800mm; clean profile height 300-800mm; Roller conveyor stepless speed regulation

0.5-6m / min; using conventional control or PLC control.


Cleaning Samples:

Technical Parameters:

ParametersQ698Q6912Q6915Q6920Q6925 Q6930Q6940
The effective cleaning width (mm)800120015002000250030004000
Dimension of inlet opening (mm)1600*8001200*4001700*4002200*4002700*8003200*8004200*400
The length of cleaning
workpiece (mm)
1200-
12000
1200-
16000
1200-
12000
1200-
12000
3000-
12000
2400-
12000
4500-
18000
The speed of conveyor (m/min)0.5-40.5-40.5-40.5-40.5-40.5-40.5-4
The thickness of cleaning
steel sheet (mm)
3-603-601.5-603-603-603-1104.5-100
Shot ball flow rate (kg/min)4*1204*2504*2506*2506*2506*3608*360
The shot ball first loading (kg)40004000400045004500800011000
Roll brush adjusting height (mm)200200350450600850900
Air capacity (m3/h)22000175601900019550277582805038000
Total power (kw)9078.3113.5156.6204.8224.55293.6


Company Information:

Our service

1. Installation and commissioning issue:
We will send 1-2 technicians to assist with machine installation and commissioning, 
customer pays for their tickets, hotel and diet, etc Customer need arrange
3-4 skilled worker and prepare insallation machinery and tools.


2. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.

3. Supply full English documents:
including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.

Product Tag:
Related categories:
Scroll to Top