Transmission Spare Part Hard Small Roller Plastic Nylon Belt Roller Pulley Wheels Price with Bearings

Min.Order: 100
Product origin: Beijing, China
Infringement complaint: complaintComplaint
US$ 0.01

Description
Transmission Spare Part Hard Small Roller Plastic Nylon Belt Roller Pulley Wheels Price with Bearings
                   Please send 2D / 3D drawings or samples to get a quote>>

Our Services
 
                                                 Product Design                                        Material Selection
                                                 Mold Design                                             Mold Making
                                                 Bulk Production                                        Logo Printing
                                                 Surface Treatment                                    Assembling
                                                 Packaging                                                 Door to Door Delivery

 
 
MaterialNylon ,mc nylon, POM,ABS,PU,PP,PE,PTFE,UHMWPE,HDPE,LDPE, PVC,etc.
ColorBlack, white, red, green, transparent or any color according to Pantone code
SizeAs per customer's requirements
TechnologyInjection molding, CNC machining, Extrusion
Surface TreatmentPowder coating, Zinc coating, Galvanization, Electro-deposition coating, Chrome/zinc/nickel plating, Polishing, Silkscreen, Black oxide
ApplicationAutomotive, ATV, Mechanical equipment, Construction, Home appliance, Aviation,
Office facilities, Agriculture, etc.
ShippmentWe have longterm cooperation with internation shipping agent and express company, so that shipping safty and arriving time are secured

Detail Image



                                                                                                           Get a Free Quotation >>> Go
Why Choose Us

Our Machine

Product Range

FAQ:
Q1.  Are you manufacture or trade company?
A: We are manufacture.

Q2.  What kind of payment do you accept?
A: Trade assurance, T/T, L/C, Weston Union are all accepted.

Q3. What is normal lead time?
A: Average 15-25days for tooling, bulk orders should be depends on quantity.

Q4. What is your standard package?
A: In general we use ziplock bag or bubble film plus cardboard boxes, wooden pallets or wooden cased will be used if necessary. Special packing method is available if needed.

Q5. What is the working life of the mould?
A: It depends on the parts we made. Besides, we will maintain or replace the mould by ourselves.

Q6. How many employees do you have?
A: We have 150 employees for factory, 45 employees for sales, 16 employees for technical support.


Contact Us
Product Tag:
Related categories:
Scroll to Top