2020 Advanced 15% Energy Saving Kgcl Power Supply Cabinet for Industrial Electric Induction Melting Furnace

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 40000 ~ 150000

Description
Application: IF Induction furnace can melt iron, steel, copper, aluminum,bronze, brass, etc. 
For product:
 Ingots, steel rebar, steel billet, iron powder, auto parts, brass statues, iron pots or manhole covers, etc.

KGCL power supply cabinet
Power supply is the most important part of one set of a furnace. The power supply cabinet is consist of many electric components. Our factory's power supply cabinet are made of the best electric components from China. So it work steady, with high effidieny, being energy saving, and not easy to get trouble.

Technical Features

1. The latest KGCL IF induction furnace,Its power factor is always at the highest state (more than 0.95), no higher harmonic, no pollution to the power grid, and have no influence on the reactive power compensation capacitor.

2. Energy saving. Compared with KGPS IF induction furnace, KGCL IF induction furnace can save 20% power consumption, which power consumption when melting iron is about 530khw/h.

3.  One draw two system. KGCL power supply with double output system, in that way, one power supply can work for two furnaces in the same time. Its total power can be arbitrarily distributed to two furnaces through adjusting the power knob ( or the digital operation screen ), so that one furnace can preserve heat while another furnace is melting. In this case, it can continuously provide molten metal to a production line. This no-stop melting way can greatly improve melting efficient and increase your capacity. Saving energy and being more practical, it is widely popular.


1- Advanced Computer Melting Management System
The on site melting system consists of a computer, digital main control board, PLC and etc. The melting process can be control through extended switches in an office. With Ethernet port, USB interface and unique IP address, it can realize data collection, transmission and monitoring of equipment anywhere you are, achieving remote diagnosis and timely troubleshooting.


2- Full Digital on-site smelting control system 
Lots of utomatic functions are available, such as automatic constant temperature, automatic drying, power distribution display, intelligent smelting management, automatic display and storage of fault information, etc.
It can be fully automatic controlled, which consists of PLC programmable controller, HMI or industrial control computer system, industrial control configuration software and various sensors, etc. It can be configured with foundry equipment and operation, and connected with various equipment, including remote display, temperature measuring instrument, thermal analyzer, spectrometer, demand controller and large screen display, etc. It is safer and more convenient to use!


3- Remote console
If the power supply cabinet placed underground,  it make it more convenient to control furnace by remote console. All meters and operation control devices are installed on the operation panel. 
The system state part of the two diagnostic touch screens is exactly the same as the power of the panel made by the host computer, which provides operators with detailed operation information at any time.


4- Fault deteciton display
Furnace is real time detected by the fault detection display. When faults are detected, such as short circuit of load, over-current, over-voltage, insufficient water pressure, high water temperature, and etc, it will be fed back to the control system which will cut off the power automatically, so it can prevent damage in advance. In addition, if there are any trouble of thyristor, compensation capacitor, voltage transformer and other components, it will automatically stop and light up the corresponding indicator.
 



Technical Support


1) Equipment design
Furnace will be customized to meet your production needing and environmental condition (maximum ambient temperate, humidity, altitude,etc) .

2) Drawings delivery
 
Technical drawing will be send to the buyer after geting the deposite, so the buyer can build basic contruction before the furnace arrived.

3) Acceptance check before delivery 
a. The supply of the inspection equipment complies with the scope of supply and technical specifications in the technical agreement.
b. Check the mechanical actions of the equipment.
c. Safety interlock of equipment and alarm function test.

4) Installation & debugging & worker training
a.  Cooperate with guidance to check the buyer installation work;
b.  Internal and electrical wiring connections between equipment;
c.  Site commissioning;, according to the actual equipment adjust to the best state;
d.  Direct buyer operating personnel to the correct use of operating equipment;
e.  Guidance on site security considerations;
f.  To guide the buyer maintenance personnel troubleshooting methods;
g.  Provide equipment specification;


Product Tag:
Related categories:
Scroll to Top