High-End Vegetable/Fruit Pre-Cooling and Fresh-Keeping Vacuum Pre-Cooling Machine

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 5900 ~ 30000

Description

High-end vegetable/fruit pre-cooling and fresh-keeping vacuum pre-cooling machine




What is Vacuum Cooler?

  • Vacuum Cooleris the quickest and most cost-efficient cooling system for vegetable, fruits, flowers & more.
  • Vacuum cooler, which can strongly improve your product quality and at the same time reduce your cooling costs, is now becoming an acceptable investment for almost all vegetable growers!
  • Coldmax Vacuum Cooler cools fresh produce quickly and uniformly in large loads within 15-30mins/cycle, also suitable for packed produces.

Vacuum Cooler Main Components:

  • Vacuum chamber--To load your vegetables.
  • Vacuum system--To takes away the air in vacuum chamber, then cool the vegetables down.
  • Refrigeration system--To catch the water vapor in ths chamber so as to ensure the continous cooling process.
  • Control system---To control and show the working condition of the vacuum cooler.

Condenser Options: Air cooling/Water cooling / Evaporative cooling Condenser Options: Air cooling/Water cooling / Evaporative cooling Function Options: Hydro system&Water spray system Door Options: Manual Door/Horizontal Sliding Door/ Upwards Lifting Door/ Vertical Lifting Door Material:Q235 carbon steel or 304 food grade stainless steel


Application Field:

  • Vegetables(All Leafy Vegetables/Broccoli/Cauli Flower/Mushrooms/Sweet corn/ etc.)
  • Flowers(Fresh cut flowers)
  • Fruits(Berries/Cherries etc.)
FAQ
 

Q1: How many steps can I get the machine from your factory to my hand?

a. send us enquiry, tell us your demand as specific as you can;

b. phone/online communication → the most suitable models suggested → design drawings → comments & modification → quote;

c. visit factory if required,

d. down payment → production → balance payment → delivery; e. local preparation ready → engineers fly to installation if needed → after sales.

 

Q2: Production time?

A2: It usually takes 20-25 working days to produce since the day when we confirm your down payment, for series equipments may need more days, will inform you before order.

 

Q3: Payment method?

A3: 100% TT is preferred, 50% TT before production, the balance 50% before delivery.


Scroll to Top