Toprise FRP Skylight Roofing Sheet Fiberglass Sheet Polycarbonate Sheet

Min.Order: 500
Product origin: Suzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 4 ~ 9.5

Description

Product Name
Fiberglass Skylight Roofing Sheet
Resin Ingredient
Advanced benzene-----new neopentyl glycol anti-ageing DTM-1 resin.
Surface Treatment
Surface applying Morplated anti-ageing glue (80 µm thickness or so) and pastes Melinex 301.
Glass Fiber
Adopting Taian high- quality glass fiber, the content no less than 30%.
Unit Weight
1800g/m² 2400g/m² 3050g/m²
Nominal Thickness
1.2mm 1.5mm 2.0mm
Heat Resistance Limit
-60 to +130
Light Transmittance
75%±2% ( light green) 53%±2% (cream white)
Anti- ultraviolet Rate
 99.9%
Tensile Strength
100Mpa
Flexural Strength
 180Mpa
Cracking Elongation Rate
 1.9%
Barcol Hardness
≥50
Thermal Expansion Coefficient
2.2×10¯5cm/cm/
Thermal Conductivity
 0.18w/m° k
Warranty
10 years


* Good No cracking phenomenon when driving nails in roof installation
* Having close combining with color steel plate. Cross- section thickness is uniform. The shape of FRP sheet is consistent with steel plate.
* Transmittance loss rate is low. No yellowing phenomenon after long term service.
* Thermal expansion coefficient is close to that of steel plate. No cracking and water leakage in nail driving place because of expand with heat and contract with cold.
* Light through FRP sheet assumes scattering shape and gentle.
* Bright and clean appearance, no distinct air bubble and cracking on FRP sheet.
* Anti- ultraviolet and anti- chemistry corrosion.
* Anti- ageing and anti- pulverization.
* Long service life.


Q: Could you customize the size?
A: We have standard thickness. We can customize the width, color and length. The length shall be less than the container length.
We need you to send roof profile drawing to us.

Q: What's your MOQ?
A: 500 meters.

Q: Could you recommend the model and quantity?
A: Yes, we can design the model and quantity as per the warehouse dimension and warehouse type.

Q:How about the lead time?
A: Normally 2 weeks. It depends on the quantity and our production plan.
Product Tag:
Related categories:
Scroll to Top