Truck Spray Booths/Garage Equipments for Bus and Truck Refinishing

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 30000 ~ 45000

Description
Large Size Preparation Cabin for Bus and Truck Refinishing
 

The bus prep booth is designed for bus preparation and sanding. It has the same working principle as a standard bus spray booth except that heating system is not equipped as standard module.

Standard features
  1. Side downdraft airflow
  2. Reinforced cabin structure
  3. 2 electric main doors
  4. 800mm plenum
  5. 2 groups of 2*11kw air handling units
  6. European standard control

Option
  1. Central dust extraction unit
  2. Heating unit
  3. Manual entry/exit door
  4. Downdraft airflow
  5. Pneumatic man lift

1.SPECIFICATIONS
ITEMSSPECIFICATIONS
ModelIT-16-5.5B Side Downdraft Bus Prep Booth
Design standardBS EN 13355: 2004+A1:2009
BS EN 60204: 2006+A1:2009
Internal dimensions 16000 X 5500 X 5500mm (L X W X H)
External dimensions16160 X 6820 X 7900mm (L X W X H)
AirflowSide Downdraft
Plenum (height)800mm
ExtractionExhaust plenum chambers on both sides of the booth
Extraction area24m2
Entrance door5460x5000mm (WxH), electric roller shutter door, 2 sets
Service door800x2000mm(WxH), 4 sets
Walls60mm rock wool walls
Ceiling lights (LED)22 sets, each 4 X 18W, 1,584W total
Sidewall lights (LED)24 sets, each 4 X 18W, 1,728W total
Brightness>1,000LUX
FiltersBag filter, high efficiency ceiling filter, filter at exhaust plenum chambers, exhaust filter
Intake/Exhaust unitDirect-type turbine fan, 2* 2x11KW, SIEMENS motor
Air volume2*35,000m3/h
Empty loaded air speed0.22m/s
ControlsCE standard control box
Inverter SCHNEIDER inverter
Rated power50KW


2.DETAILS

FAQ
Q: Can you supply prep booth for heavy machinery preparation and sanding?
A: Yes. We can custom design and make the prep booth according to your requests.
 
Q: What is the warranty?
A: 2-year warranty.
 
Q: Do you supply sandblasting booth?
A: Sorry, we do not manufacture and supply sandblasting booth. We specialize in spray booth, prep station and mixing room etc.
 
Q: How the central dust extraction unit is integrated to the bus prep booth?
A: We can send you the layout for your approval.
Usually, the central dust machine is placed outside the booth, and the servo will be assembled on the wall panels in order not to occupy the workspace inside the booth.
 
Q: I also need two sets of man lifts for the bus prep booth.
A: That's okay. Gentle reminder, to have two man lifts inside the booth, the recommended minimum internal width of the bus prep booth is 5500mm.


Scroll to Top