Sy-1175 Medical Automatic X Ray Film Developed Processor Processing with Cheapest Price

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ -1

Description
SY-1175 Medical Automatic X Ray Film Developed Processor Processing with Cheapest Price

Feature of automatic x-ray film developed processor processing:

♥ Applied outlook design, load fleet design to adgusted and maintain conventently                 

♥ Run time set in 135 S,directly wash glandula film animal film lab and print film                 

♥ Excellent micro-computered flate can simple set warm and speed of wash machine                  

♥ Maintain conventiently send accurancy axis protect film for daily clear               

♥ Protect-oxygen function,effectively protect drug liquid from be old, producing high clear image.

Specification of automatic x-ray film developed processor processing:

Rinse width:minimun:3×6inch,maximum:14×17inch    
Process time:95~250s(full program),20~60s(develop time)    
Developer temperature:20°C~40°C(±0.3)(adjust) 
Wash quantity:105 paper per hour,(14×17inch),165paper per hour(10×12inch) 
Dry temperature: 40°C~65°C(adjust) 
Power:200V/50Hz/8.8A  2000W
Channel volume: 5.2L for develop,fixation and wash each one.    
Washing control:to enter water 2~8L/min automatically. 

 

Picture of automatic x-ray film developed processor processing:



 

Main products:




FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.

Scroll to Top