2016 Hot Sales Powder Painting Booth Package

Min.Order: 1
Product origin: Hangzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 500 ~ 20000

Description
2016 hot sales powder coating booth package
equipo de pintura
Industrial Automatic Spray Booths easy operation with good powder recovery systems.
our customer of
Ecuador buy 1 automatic powder spray booth,Reciprocator:1set,travel:2.5m,
Automatic gun:4pcs,manual gun:1pcs,
we ordered a 20GP to send the goods in
Assembly
booth size and color can be designed by the requst.

Specification:
1.Spray booth: 
Inner Size: L3000 x W1400x H1550mm
Booth board: SPCC/= 1.5mm Bending and forming
Under frame:40# square tube
Filters:325*900- 4pcs 
fan motor: 5.5KW, 1pcs 
2.Technical data
ModelCOLO-S-3145
Booth Typedrive-thru
Operator dimensions1400width x 1550 height x 3000 depth
Weight750kg
Power supplyElectric
Nominal power5.5kW
Voltage380V
Frequency50-60Hz
FiltersPolyester
Filters count4
Filters hang typeeasy for change
Filter cleaning systemPneumatic
Warranty12 months
3.Advantage:
1.Large coating opening, optimal utilisation of the size of the object
2.Working with reciprocator 
3.Smooth interior, easy to clean.
4.the control and monitoring of each active component can be individually regulated, ensuring better service life for pneumatics and electrics.
5.Short powder cycle, safeguards the powder.
6.Energy saving air circulation, the extracted air is fed back into the paint shop.
Also economical in mixed powder mode for individual colours.

4.Replacing the filter cartridges Replacing the filter cartridges
Procedure for replacing the filter cartridges

If a filter cartridge is damaged, but the damage can not be found, then the complete filter
cartridges set must be replaced. The access to the filter

cartridges takes place from the rear of the booth


 
Dismantling: 
1.fix the screw on the top
2.Hold the cartridge with both hands, so that the filter's six ears for quick release cover six corresponding gap
3.His hands up top, while the rubber ring as a fulcrum to sixty degrees clockwise
4.Check the filter is fully embedded in the quick release cover, hand gently pulled the filter is securely
5.Control cabinet-Bottom:
1,power on/off
2,hopper go up/go down
3, emergency stop
PLC Controller
Operation:
1.press  bottom 1 ,make the power on
2,Press ↑or,make the display screen display like this
3,Press F4 ,then into the booth control interface like this
4,Press F6,then the fan will on ,like this


When you want to stop the work, please press F6 ,make the fan off, like this
Then press the bottom 1 to make the power off.
In the side of the booth have the switch to control the light lamp


6.pic details show







Any question,just contact us!!
Product Tag:
Related categories:
Scroll to Top