20 Tons High quality/High cost performance Tube Ice Machine (TV200)

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 30000

Description
20 Tons High Quality Tube Ice Machine (TV200)

Koller TV series tube ice machine is a type ice machine, which produces cylinder shape ice with a hole in the middle; It adopts flooded evaporator, which improves ice making efficiency and capacity. Meanwhile, compact structure design can save installation space. Ice thickness and hollow part size can be adjusted according to customer requirements. Under PLC program control system to work automatically, the machine has high capacity, low power consumption and minimal maintenance.

Tube Ice Machine TV200 mainly includes three parts: The tube ice maker, evaporator and the cooling tower;

Tube Ice machine Features:
1. The tube ice looks like hollow cylinder, its outer diameter is 28mm and 34mm with length from 27mm-50mm. The inner diameter can be adjusted according to the ice making time. Usually it's between 5mm-10mm.


2. The mainframe structure adopts the stainless steel 304 material. It can put the food directly into the production room which cover a small area, low production cost, high frozen efficiency, save energy, short installation period and easy to operate.

3. The ice is quite thick and transparent, beautiful. Long storage. Not easy to melt, fine permeability.

4. Main applications: Daily using, vegetable fresh-keeping, pelagic fishery fresh-keeping, chemical processing, building projects and other places need to use ice.



Installation

Installing by the user:
We will test and install the machine before shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.

Installing by Koller engineers:
(1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user should provide accommodation and round-trip ticket for our engineer.

(2) Before our engineers' arrival, the installation place, electricity, water and installation tools should be prepared. Meanwhile, we will provide you a Tool List with the machine when delivery.

(3) All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.

(4) 2~ 3 workers are required to assist the installation for big project.

(5) Any delay due to customer's reason, it will be charged from the 8th day, USD100/day for one person as installation fee. Free of charge for one week.

Warranty

(1) 12 months warranty after delivery.
(2) Professional after-sales department to provide 24/7 technical support, all complaints should be replied within 24 hours.
(3) Over 10 engineers available to service machinery overseas.
(4) Free spare parts replacement within warranty period.
(5) beyond guarantee period, we will charge market price for spare parts.

Scroll to Top