PU Foam Shutter Rolling Machine

Min.Order: 1
Product origin: Tianjin, China
Infringement complaint: complaintComplaint
US$ 15000 ~ 21000

Description
pu foam shutter rolling machine

pu foam shutter rolling machine working flow:

Decoiling------Feeding------Roll forming------Foam injection-----roll forming -------cutting------Run out table

MATERIAL:

1) Coil width:229mm;

2) Suitable coil thickness: 0.6-1.0mm;

3) Suitable raw materials: galvanized (GI), we test machine as our 114mm width steel coil;

4) The yield strength of raw material: 235 Mpa-550 Mpa.
pu foam shutter rolling machine parameters

 1 Uncoiler 3 tons manual uncoiler
 2 Feeding guide 2 roller feeding guide
 3  Forming rollers 37 station rollers
 4  Roller material 50mm diameter cr12 steel, with twice CNC precise process
 5  Forming body 100mm x 80mm square pipe with 3.5mm
 6  Forming body outside With 16mm steel plate welded
 7  Transmission Gear transmission
 8  Raw material Galvanized steel, galvalume steel, color steel coil
 9  Raw material thick range 0.5mm to 1.2mm
 10  Unloading support 2 pieces 3meter
 11  Main motor 5.5KW
 12  Pump motor 4KW
 13  PLC control system Automatic control system, language: English, spanish, russion and so on.
 14  Electric elements PLC control panel, transducer imported from Mitsubishi of Japan.
 Other elements are from famous suppliers of China.
 15  Cutter blades Cr12 mold steel with quenched treatment.
 16  Factory area The machine is the 7m length and 2m width, and output sheet according to the customer the longest sheet to calculate
 17 Warrant time 14months

MACHINE COMPONENTS:

1) Manual decoiler*1pcs (capacity: 3 tons);

2) Guiding equipment*1pcs;

3) Roll forming equipment*1pcs;

4) Post cutting blade*1pcs;

5) Hydraulic station*1pcs;

6) PLC control system*1pcs;

7) Receiving table*1pcs.
 
8)Foam injection
Popular drawing of pu foam shutter rolling machine

pu foam shutter rolling machine reference picture:
after sales services :
1. Warranty :One year,and we will provide technical support for whole life of the equipment.
2. Delivery time: Within 25 days after deposit receipt your payment
3. Guarantee period: 24months free service/ pay service all the machine life
4. Installation and training If buyers visit our factory and check the machine, we will teach you how to install and use the machine and also train your workers/technician face to face.