Work flow
PVC powder +additive → mixer →SJSZ series extruder →Coat-hanger type mould →Vacuum calibration cooling platform →cooling rollers and edge-cutting device →Haul off →stacker
Technical information
Description | Parameter |
Feed material | PVC+ assistant materials(also can add wood powder |
Product size | 1220*2440*5-20mm |
Production line speed | 0.8-1.5m/min |
Max. output | 350-500kg/h |
Outline size | 25×2.5×3 L×W×H(m),unsaturated |
Weight | 16T |
Total power | 255kw |
Actual energy consumption power | 210kw |
Main composition
No. | Part. | Qty. |
1 | SJSZ80/156 Conical Double-screw Extruder | 1set |
2 | Mould | 1set |
3 | Calibration Forming Table | 1set |
4 | Cooling Bracket | 1set |
5 | Haul-off Unit | 1set |
6 | Transverse Cutting Bracket | 1set |
7 | Trim Cutting | 1set |
8 | Stacker | 1set |
Auxiliary Machines for your choice
No. | Part. | Qty. |
1 | SHRL500/1000 Mixer | 1set |
2 | SWP-400 Crusher | 1set |
3 | SMP-500 Miller | 1set |
5 | Water Chiller | 1set |
SJS80/156 Twin Screw Extruder
Mould
1.We will provide the Feasibility Analysis Report for the wood-plastic project.
2.We will provide the model selection and technical parameter for wood-plastic machinery.
3.We will provide the design for the plant and electric power accounting for the facilities.
4.We will provide the design for wood-plastic formula according to the product requirements.
5.We will provide the technology of wood-plastic product surface treatment
6.We will provide technique training for operator.
7.We will provide solution for the practical problem during the production.
8.We will install and test the machine for free.
9.We will provide turnkey project to customers.
1. Quality Control Management
Q: Is there quality control on all production lines?
A: Yes, all production lines have adequate quality control
Q: Do the QA/QC inspectors work independently from the production line?
A: Yes
Q:How many QA/QC inspectors in total?
A: 4
Q: Number. of Employees in Each Production Line
A: Supervisor 1 ; No. of Operators 29 ;No. of In-line QC/QA 2
2.Supplier Management
Q:Does the company have a supplier assessment procedure?
A:Yes
Q:Does the company have an updated list of approved suppliers?
A:Yes
Q:Does the company establish and implement a standard procedure for purchasing contract review and approval?
A:Yes, with written standard procedures
Q:Does the company keep its supplier assessment reports?
A:Yes, with written standard procedures
Q:Does the company keep its supplier assessment reports?
A:Yes, assessment reports are available for the last 1-3 years
Q:Are the company's purchasing documents sufficient to ensure product safety control and their customers' requirements?
A:Yes, the purchasing document includes all the information required
Q:Is there a procedure to conduct random product inspections after final packaging?
A:Yes, with clear standard and written inspection records
Now we have machines in stock,sincerely invite you to vist our factory! Also you can contact me for machine's running video.