Advantage:
1. Fuel: Diesel/LPG/Natural gas 2. Application for infectious medical waste, animal carcass, poultry leather, daily garbage, disposable waste, plastic waste, etc.
3. Daily waste can be burned once by gasified incineration.
4. Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5. Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
6. Easy operation, saving labor cost
Better Environmental Protection Technology Co., Ltd., integrates development, research, design, production, and construction of environmental protection products with the help of a professional technical team in the environmental protection industry. In the field of industrial and urban sewage treatment and garbage treatment, we are based on the domestic and foreign markets with excellent quality and a good reputation.
Our Services & Strength:
We are professionals in environmental protection equipment manufacture, sale, and application. Our main product is a waste incinerator, water treatment machine, dissolved air floatation machine, and so on.
Better Advantages:
1. Listed company with good reputation and large scale
2. Sewage treatment equipment manufacturer, quality strict control
3. The fastest delivery time, directly docking the factory, reducing your waiting time
4. Engineers provide professional on-site installation guidance
5. Rich experience, docking with government projects and garbage treatment and sewage treatment projects in various industries
6. Free 24-hour online after-sales service
FAQ:
Q: What about your company?
A: Our company is an Incinerator manufacture. We have over 14 years of experience in waste incinerator manufacture and application.
Q: How to buy incinerator?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommend you the suitable model incinerator.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on the order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipment arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After debugging equipment, he will teach your workers how to use it and how to maintain it.
Q: How to visit your factory?
A: You could fly to Qingdao airport and we will pick up you to our company.