Steel Bridge Viaduct Highway Railway Column Pier Formwork

Min.Order: 100
Product origin: Yancheng, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 1000 ~ 1200

Description

Product Description

Pier Formwork for Bridge and Construction


The Pier Formwork is very important in the construction of highway bridge, overpass bridge, railway bridge, pedestrian bridge,
ramp bridge etc. It is used for concrete Colunm Pier Casting in situ, common shapes are: top round pier, cone pier, Y shape pier,
hyperbola pier, vase shape pier, linear shape pier, V shape pier, rectangle pier and other speacial shape etc.

According to the shape of Pier Formwork, these formworks are always devided into two types: 
1.General type (Cross Section Shape: Circle, Square, rectangle, Oval) 
2.Special type (Cross Section Shape: Curved, Parabolic, other special design)

Features of General Type and Special Type:
Gerneral Type: Nice Universality, Good economic benefit, High reusable rate, Short lead time.
Special Type: Attractive Appearance, Specially Designed for Certain Application, Longer lead time with higher costs.
For the Pier Fromwork of special type, there are 3 common shapes widely applied in the bridge constructions:
A.Hyperbolic Pier Formwork: Used in road bridge, railway bridge, flyover, ramps, etc. 
B.Portal Pier Formwork: Used in road  bridges, railway bridges, such as: Double-Pier, Triple-Pier, Multi-Pier. 
C.Corbel Pier Formwork: Used in freight railway bridges, including pier body and pier cap forms.

Products Show

Characteristic
 
Bridge Formwork
ItemPart nameBridge Formwork
1MaterialQ235B,Q345,Q355 Steel
2Design timeThe time of design the fabrication drawings is 5 days.
3FabricationThe normally time is about 40 days.
4PaintingEach formwork paint three times,a primer,a middle paint,a top paint.Prevent rust corrosion of formwork.
5DeliveryLIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.
6Installation on project siteLIANGGONG can arrange 1-2 enginner to provide technical support to the project site.

Packing&Delivery
 
Packing Details:Package Box, Steel Pallet, Steel Frame, Container.

Delivery Details:Generally it is 5-30 days, it is according to quantity.

Port: Shanghai


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company
 
Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.   

Customer Photos


FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Product Tag:
Related categories:
Scroll to Top