Taizhou Mould Factory Quality Customized Injection Plastic Tooling

Min.Order: 1
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 2000 ~ 80000

Description
Product NameTaizhou Mould Factory Quality injection plastic tooling
Product materialABS
Core& Cavity Steel718
Steel hardness:HRC34-38
Mould StandardDME, etc
Cavity NumberSingle
Injection Systemside  gate
Ejector Systemejector pin+ejector cylinder
mould base
S50C
 
Cycle Time
50S
 
Tooling lead time60DAYS
Mould life1, 000, 000SHOTS
Quality assuranceISO9001
SpecificationAccording to client' s requirements

 

 
Our Advantage         1. High quality
        2. Reasonable price
        3. On time delivery
        4. Good After-sale service
        5. Strict quality control
        6. All the mould are automotic.

 

 
Offer youIn-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.

plastic furniture mould
1. Samples/Drawing & Requirement from you
2. Mould design: we will Communicate& Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould: following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!
7. Your instruction & confirmation for shipment.
8. Ready made mould before packing.

 

 

For more information please contact us.
 

Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.


Product Tag:
Related categories:
Scroll to Top