2023 Gold Supplier Steel Work Scaffolding Platform

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 1780

Description
steel work scaffolding platform

Product Description

steel work scaffolding platform is throught the top of suspension mechanism on the roof of buildings, hanging with wire rope along building facades, the motor assembly with two side of gondola and drive the load which inside the gondola up and down. work gondola have a stromg adaptability to construction site, it is always to be used for wall cleaning, maintenance, decoration, windows or other kind glasses cleaning, installation, maintenance or high buildings surface painting works.

We pay all our attention for the Construction work cradle, working construction cradle, hanging construction cradle, construction cradle design and manufacturing. Wall construction cradle for high buildings and windows cleaning A good tools and make work efficiently.



Technical parameters of steel work scaffolding platform

modelzlp500zlp630zlp800zlp1000
appearancepainting/hot galvanized
fabrication materialsteel/aluminum alloy
rated load500kg630kg800kg1000kg
lifting speed9-11m/min9-11m/min8-10m/min8-10m/min
motor power2x1.5kw2x1.5kw2x1.8kw2x2.2kw
brake torque16km16km16km16km
steel rope angle adjusting range3°-8°3°-8°3°-8°3°-8°
distance between two steel rope≤100mm≤100m≤100m≤100m
counter weight(optional)25kgx30pcs25kgx36pcs25kgx40pcs25kgx44pcs
diameter of steel rope8.3mm8.3mm9.1mm10.2mm
max lifting height(m)300m300m300m300m
motor rotation speed1420r/min1420r/min1420r/min1420r/min
voltage(3phases)(optional)220v/380v/415v/440v    50hz/60hz to be OEM


Products Show

Photos of main parts for steel work scaffolding platform
modelzlp500zlp630zlp800zlp1000
appearancepainting/hot galvanized
fabrication materialsteel/aluminum alloy
rated load500kg630kg800kg1000kg
lifting speed9-11m/min9-11m/min8-10m/min8-10m/min
motor power2x1.5kw2x1.5kw2x1.8kw2x2.2kw
brake torque16km16km16km16km
steel rope angle adjusting range3°-8°3°-8°3°-8°3°-8°
distance between two steel rope≤100mm≤100m≤100m≤100m
counter weight(optional)25kgx30pcs25kgx36pcs25kgx40pcs25kgx44pcs
diameter of steel rope8.3mm8.3mm9.1mm10.2mm
max lifting height(m)300m300m300m300m
motor rotation speed1420r/min1420r/min1420r/min1420r/min
voltage(3phases)(optional)220v/380v/415v/440v    50hz/60hz to be OEM



Main Parts of steel work scaffolding platform

1. construction cradle(basket): Steel or Aluminum Alloy (painted or hot galvanized)
2. Suspension Mechanism: Steel (painted or hot galvanized)
3. Electric hoists:LTD6.3 or LTD8
4. Safety Lock: LST30
5. Electric control box: Along with hoists
6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm
7. Safety rope: 18mm,20mm
8. Electric cable: 3*2.5+2*1.5
9. Counterweights: Cement , cement with steel cover & Iron counterweight
10. Spare parts 


Packing and Shipping

Packages Details of steel work scaffolding platform for high buildings and windows cleaning
 
packageplatformcounter weighthoist & safety lockcontrol panel & other smallparts
filmpalletwooden casecarton box



Our Company
The steel work scaffolding platform can be customized according to customers'requirements(drawing, specifications and so on).


Partners



About us
You can get high quality steel work scaffolding platform for high buildings maintanence, windows cleaning, and professional service from us 
You will get reply within 24 hours.





  
Scroll to Top