Item | Nickel alloy UNS N04400 W.Nr 2.4360 monel 400 round bar |
Standard | ASTM A162, ASTM B127, ASTM B435, |
Material | ASTM:N02200,N02201,N04400,N04404,N04405,N05500,N06002,N06007, N06022,N06025,N06030,N06045,N06059,N06102,N06200,N06230,N060333, M060455,N06600,N07001,N07750,N08221,N08020,N08024,N08800,etc |
JIS:N0,N2,N1,NW2200,NW2201,NW4400,NW5500,NW6002,etc | |
DIN:H-Ni99.96,H-Ni99.95,H-Ni99.92,H-Ni99.90,H-Ni99.5,H-Ni99,etc | |
GB:N2,N4,N6,N8,NY1,NY2,NY3,NMn3,NMn5,ect | |
Dia | 3-300mm |
Length | 2m, 2.44m, 3m, or as required |
Surface | mill,brush,polished,bright,hair line,sand blast,etc |
MOQ | 100Kg |
Application | 1)70% Ni was used for produce stainless steel and heat resistance steel |
Form | ASTM |
Rod and bar | B 160 |
Plate, sheet and strip | B 162, B 906 |
Seamless pipe and tube | B 161, B 829 |
Welded pipe | B 725, B 775 |
Welded tube | B 730, B 751 |
Welding fitting | B 366 |
Forging | B 564 |
Δ Application
Δ Grade Series
Inconel Series | Inconel 718 / UNS N07718 / DIN W. Nr. 2.4668 Inconel 601 / UNS N06601 / DIN W. Nr. 2.4851 Inconel 625 / UNS N06625 / DIN W. Nr. 2.4856 Inconel 725 / UNS N07725 Inconel X-750 / UNS N07750 / DIN W. Nr. 2.4669 Inconel 600 / UNS N06600 / DIN W. Nr. 2.4816 |
Hastelloy Series | Hastelloy B / UNS N10001 Hastelloy B-2 / UNS N10665 / DIN W. Nr. 2.4617 Hastelloy C Hastelloy C-4 / UNS N06455 / DIN W. Nr. 2.4610 Hastelloy C-22 / UNS N06022 / DIN W. Nr. 2.4602 Hastelloy C-276 / UNS N10276 / DIN W. Nr. 2.4819 Hastelloy X / UNS N06002 / DIN W. Nr. 2.4665 |
Incoloy Series | Incoloy 925/UNS N09925-Oil Incoloy 825 / UNS N08825 / NS142 / W.Nr 2.4858 Incoloy 800HT / UNS N08811 / W.Nr 1.4954 Incoloy 800H/UNS N08810/W.Nr 1.4876 Incoloy A-286 / UNS S66286 / W. Nr. 1.4980 |
Monel Series | Monel 400 / UNS N04400 / W.Nr 2.4360 |
Nickel Series | Nickel 200 / UNS N02200 / W.Nr 2.40 Nickel 201 / GB/T N02201 / W.Nr 2.4060 |
Δ Product Test
Δ Production Process
Δ Trading Information
Trade Terms | EXW, FOB, CIF, CRF, DAP |
MOQ | 100kg |
Payment terms | 1).30% deposit, the balance before loading by T/T 2).30% deposit, the balance against copy of B/L by T/T 3).30% deposit by T/T, the balance by L/C at sight 4).100% L/C at sight |
Lead time | 5~10 days after get deposit or origin L/C document |